No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Branch County, MI averages 6.1 m/s (13.6 mph). A 10 kW turbine there would make about 20,446 kWh a year, worth $4,443 at MI's 21.73¢/kWh. Against an installed cost of about $100,000, that is a payback of 23 years, and the turbine is built to last about 20.

What to do in Branch County

A home turbine is not worth buying for savings in Branch County unless your spot is far windier than the county average, 6.4 m/s at the hub against 6.1 m/s here. Per kW, solar panels would make about 1,115 kWh a year here against the turbine's 2,045, so get a solar quote first.

What would have to change

Against the rest of MI

Branch County is the 685th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MI is Keweenaw County at 7.4 m/s, payback 15 years.

Month by month in Branch County

January is the strongest month here, at 6.92 m/s and about 2,251 kWh. August is the weakest, 4.76 m/s and 928 kWh, so the best month makes 2.4 times the worst. November to March brings in 51% of the year's output in Branch County.

MonthWind at 30 mOutputWorth
January6.92 m/s2,251 kWh$489
February6.87 m/s2,003 kWh$435
March6.66 m/s2,086 kWh$453
April6.91 m/s2,168 kWh$471
May6.01 m/s1,683 kWh$366
June5.27 m/s1,185 kWh$258
July4.77 m/s933 kWh$203
August4.76 m/s928 kWh$202
September5.36 m/s1,237 kWh$269
October6.41 m/s1,930 kWh$419
November6.69 m/s2,040 kWh$443
December6.69 m/s2,108 kWh$458

What a taller tower would buy

Measured at 10 m the wind in Branch County averages 4.78 m/s; at 50 m it is 6.84 m/s. That gives a shear exponent of 0.223, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,587 to 25,892 kWh a year, 56% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.58 m/s16,587 kWh28 years
30 m6.1 m/s20,472 kWh23 years
40 m6.51 m/s23,466 kWh20 years
50 m6.84 m/s25,892 kWh18 years

Counties around Branch County

1 of the 6 closest counties is windier at turbine height; the windiest, Hillsdale County, averages 6.12 m/s.

Sun versus wind in Branch County

Branch County gets 3.82 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,115 kWh a year; one kW of the turbine above makes 2,045. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.