No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Brown County, NE averages 6.77 m/s (15.1 mph). A 10 kW turbine there would make about 25,384 kWh a year, worth $3,280 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Brown County

A home turbine is not worth buying for savings in Brown County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.77 m/s here. Per kW, solar panels would make about 1,264 kWh a year here against the turbine's 2,538, so get a solar quote first.

What would have to change

Against the rest of NE

Brown County is the 38th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Brown County

January is the strongest month here, at 7.33 m/s and about 2,496 kWh. July is the weakest, 5.72 m/s and 1,501 kWh, so the best month makes 1.7 times the worst. November to March brings in 46% of the year's output in Brown County.

MonthWind at 30 mOutputWorth
January7.33 m/s2,496 kWh$322
February7.04 m/s2,095 kWh$271
March7.06 m/s2,336 kWh$302
April7.27 m/s2,380 kWh$307
May6.79 m/s2,165 kWh$280
June6.13 m/s1,698 kWh$219
July5.72 m/s1,501 kWh$194
August5.74 m/s1,512 kWh$195
September6.67 m/s2,026 kWh$262
October7.06 m/s2,336 kWh$302
November7.17 m/s2,323 kWh$300
December7.22 m/s2,427 kWh$314

What a taller tower would buy

Measured at 10 m the wind in Brown County averages 5.38 m/s; at 50 m it is 7.53 m/s. That gives a shear exponent of 0.209, typical of ordinary open country. Going from 20 m to 50 m takes output from 21,318 to 30,739 kWh a year, 44% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.22 m/s21,318 kWh36 years
30 m6.77 m/s25,366 kWh31 years
40 m7.19 m/s28,368 kWh27 years
50 m7.53 m/s30,739 kWh25 years

Counties around Brown County

1 of the 6 closest counties is windier at turbine height; the windiest, Thomas County, averages 6.78 m/s.

Sun versus wind in Brown County

Brown County gets 4.33 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,264 kWh a year; one kW of the turbine above makes 2,538. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.