TurbinePayback

Wind Turbine Payback in Loup County, NE

Wind turbine payback in Loup County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Loup County, NE averages 6.72 m/s (15 mph). A 10 kW turbine there would make about 25,020 kWh a year, worth $3,233 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Loup County

A home turbine is not worth buying for savings in Loup County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.72 m/s here. Per kW, solar panels would make about 1,291 kWh a year here against the turbine's 2,502, so get a solar quote first.

What would have to change

Against the rest of NE

Loup County is the 56th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Loup County

April is the strongest month here, at 7.33 m/s and about 2,412 kWh. August is the weakest, 5.62 m/s and 1,436 kWh, so the best month makes 1.7 times the worst. November to March brings in 46% of the year's output in Loup County.

MonthWind at 30 mOutputWorth
January7.17 m/s2,401 kWh$310
February7.04 m/s2,096 kWh$271
March7.11 m/s2,364 kWh$305
April7.33 m/s2,412 kWh$312
May6.76 m/s2,150 kWh$278
June6.16 m/s1,716 kWh$222
July5.62 m/s1,436 kWh$186
August5.62 m/s1,436 kWh$186
September6.66 m/s2,022 kWh$261
October7.03 m/s2,315 kWh$299
November7.07 m/s2,267 kWh$293
December7.08 m/s2,348 kWh$303

What a taller tower would buy

Measured at 10 m the wind in Loup County averages 5.33 m/s; at 50 m it is 7.48 m/s. That gives a shear exponent of 0.211, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,928 to 30,400 kWh a year, 45% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.17 m/s20,928 kWh37 years
30 m6.72 m/s24,989 kWh31 years
40 m7.14 m/s28,010 kWh28 years
50 m7.48 m/s30,400 kWh26 years

Counties around Loup County

4 of the 6 closest counties are windier at turbine height; the windiest, Brown County, averages 6.77 m/s.

Sun versus wind in Loup County

Loup County gets 4.42 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,291 kWh a year; one kW of the turbine above makes 2,502. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.