TurbinePayback

Wind Turbine Payback in Brown County, WI

Wind turbine payback in Brown County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Brown County, WI averages 6.34 m/s (14.2 mph). A 10 kW turbine there would make about 22,225 kWh a year, worth $4,234 at WI's 19.05¢/kWh. Against an installed cost of about $100,000, that is a payback of 24 years, and the turbine is built to last about 20.

What to do in Brown County

A home turbine is not worth buying for savings in Brown County unless your spot is far windier than the county average, 6.9 m/s at the hub against 6.34 m/s here. Per kW, solar panels would make about 1,063 kWh a year here against the turbine's 2,223, so get a solar quote first.

What would have to change

Against the rest of WI

Brown County is the 420th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WI is Manitowoc County at 7.32 m/s, payback 18 years.

Month by month in Brown County

January is the strongest month here, at 6.96 m/s and about 2,270 kWh. July is the weakest, 5.27 m/s and 1,223 kWh, so the best month makes 1.9 times the worst. November to March brings in 48% of the year's output in Brown County.

MonthWind at 30 mOutputWorth
January6.96 m/s2,270 kWh$432
February7.04 m/s2,095 kWh$399
March6.66 m/s2,087 kWh$398
April6.87 m/s2,149 kWh$409
May6.18 m/s1,788 kWh$341
June5.57 m/s1,359 kWh$259
July5.27 m/s1,223 kWh$233
August5.29 m/s1,234 kWh$235
September6.05 m/s1,653 kWh$315
October6.72 m/s2,126 kWh$405
November6.78 m/s2,090 kWh$398
December6.79 m/s2,171 kWh$414

What a taller tower would buy

Measured at 10 m the wind in Brown County averages 5.07 m/s; at 50 m it is 7.04 m/s. That gives a shear exponent of 0.204, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,519 to 27,328 kWh a year, 48% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.84 m/s18,519 kWh28 years
30 m6.34 m/s22,249 kWh24 years
40 m6.73 m/s25,069 kWh21 years
50 m7.04 m/s27,328 kWh19 years

Counties around Brown County

3 of the 6 closest counties are windier at turbine height; the windiest, Manitowoc County, averages 7.32 m/s.

Sun versus wind in Brown County

Brown County gets 3.64 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,063 kWh a year; one kW of the turbine above makes 2,223. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.