TurbinePayback

Wind Turbine Payback in Buena Vista city, VA

Wind turbine payback in Buena Vista city

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Buena Vista city, VA averages 3.02 m/s (6.8 mph). A 10 kW turbine there would make about 2,661 kWh a year, worth $451 at VA's 16.95¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Buena Vista city

A home turbine is not worth buying for savings in Buena Vista city unless your spot is far windier than the county average, 7.3 m/s at the hub against 3.02 m/s here. Per kW, solar panels would make about 1,232 kWh a year here against the turbine's 266, so get a solar quote first.

What would have to change

Against the rest of VA

Buena Vista city is the 3,048th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in VA is Northampton County at 7.01 m/s, payback 22 years.

Month by month in Buena Vista city

March is the strongest month here, at 3.57 m/s and about 393 kWh. August is the weakest, 2.30 m/s and 82 kWh, so the best month makes 4.8 times the worst. November to March brings in 59% of the year's output in Buena Vista city.

MonthWind at 30 mOutputWorth
January3.53 m/s379 kWh$64
February3.64 m/s378 kWh$64
March3.57 m/s393 kWh$67
April3.49 m/s352 kWh$60
May2.88 m/s191 kWh$32
June2.61 m/s130 kWh$22
July2.39 m/s96 kWh$16
August2.30 m/s82 kWh$14
September2.59 m/s126 kWh$21
October2.96 m/s212 kWh$36
November3.16 m/s254 kWh$43
December3.24 m/s287 kWh$49

What a taller tower would buy

Measured at 10 m the wind in Buena Vista city averages 1.79 m/s; at 50 m it is 3.86 m/s. That gives a shear exponent of 0.477, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,337 to 5,894 kWh a year, 341% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.49 m/s1,337 kWhover 100 years
30 m3.03 m/s2,676 kWhover 100 years
40 m3.47 m/s4,212 kWhover 100 years
50 m3.86 m/s5,894 kWhover 100 years

Counties around Buena Vista city

4 of the 6 closest counties are windier at turbine height; the windiest, Lexington city, averages 3.41 m/s.

Sun versus wind in Buena Vista city

Buena Vista city gets 4.22 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,232 kWh a year; one kW of the turbine above makes 266. Kilowatt for kilowatt, panels make 4.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.