Wind Turbine Payback in Burke County, ND

Wind turbine payback in Burke County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Burke County, ND averages 6.41 m/s (14.3 mph). A 10 kW turbine there would make about 22,743 kWh a year, worth $2,834 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Burke County

A home turbine is not worth buying for savings in Burke County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.41 m/s here. Per kW, solar panels would make about 1,148 kWh a year here against the turbine's 2,274, so get a solar quote first.

What would have to change

Against the rest of ND

Burke County is the 309th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in Burke County

October is the strongest month here, at 6.76 m/s and about 2,149 kWh. July is the weakest, 5.69 m/s and 1,479 kWh, so the best month makes 1.5 times the worst. November to March brings in 44% of the year's output in Burke County.

MonthWind at 30 mOutputWorth
January6.71 m/s2,121 kWh$264
February6.23 m/s1,641 kWh$204
March6.67 m/s2,093 kWh$261
April6.76 m/s2,080 kWh$259
May6.59 m/s2,043 kWh$255
June6.10 m/s1,682 kWh$210
July5.69 m/s1,479 kWh$184
August5.72 m/s1,501 kWh$187
September6.29 m/s1,797 kWh$224
October6.76 m/s2,149 kWh$268
November6.79 m/s2,101 kWh$262
December6.55 m/s2,020 kWh$252

What a taller tower would buy

Measured at 10 m the wind in Burke County averages 5.09 m/s; at 50 m it is 7.13 m/s. That gives a shear exponent of 0.209, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,871 to 27,967 kWh a year, 48% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.89 m/s18,871 kWh43 years
30 m6.41 m/s22,728 kWh35 years
40 m6.81 m/s25,639 kWh31 years
50 m7.13 m/s27,967 kWh29 years

Counties around Burke County

4 of the 6 closest counties are windier at turbine height; the windiest, Mountrail County, averages 6.53 m/s.

Sun versus wind in Burke County

Burke County gets 3.93 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,148 kWh a year; one kW of the turbine above makes 2,274. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.