TurbinePayback

Wind Turbine Payback in Caledonia County, VT

Wind turbine payback in Caledonia County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Caledonia County, VT averages 3.6 m/s (8.1 mph). A 10 kW turbine there would make about 4,736 kWh a year, worth $1,133 at VT's 23.93¢/kWh. Against an installed cost of about $100,000, that is a payback of 88 years, and the turbine is built to last about 20.

What to do in Caledonia County

A home turbine is not worth buying for savings in Caledonia County unless your spot is far windier than the county average, 6.2 m/s at the hub against 3.6 m/s here. Per kW, solar panels would make about 1,013 kWh a year here against the turbine's 474, so get a solar quote first.

What would have to change

Against the rest of VT

Caledonia County is the 2,402nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in VT is Franklin County at 3.97 m/s, payback 65 years.

Month by month in Caledonia County

March is the strongest month here, at 4.34 m/s and about 713 kWh. August is the weakest, 2.82 m/s and 179 kWh, so the best month makes 4.0 times the worst. November to March brings in 60% of the year's output in Caledonia County.

MonthWind at 30 mOutputWorth
January4.20 m/s647 kWh$155
February4.48 m/s706 kWh$169
March4.34 m/s713 kWh$171
April4.05 m/s563 kWh$135
May3.39 m/s333 kWh$80
June3.02 m/s219 kWh$52
July2.83 m/s181 kWh$43
August2.82 m/s179 kWh$43
September3.02 m/s219 kWh$52
October3.43 m/s346 kWh$83
November3.69 m/s420 kWh$101
December3.93 m/s530 kWh$127

What a taller tower would buy

Measured at 10 m the wind in Caledonia County averages 2.31 m/s; at 50 m it is 4.42 m/s. That gives a shear exponent of 0.403, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,767 to 8,865 kWh a year, 220% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.06 m/s2,767 kWhover 100 years
30 m3.6 m/s4,726 kWh88 years
40 m4.04 m/s6,779 kWh62 years
50 m4.42 m/s8,865 kWh47 years

Counties around Caledonia County

1 of the 6 closest counties is windier at turbine height; the windiest, Orleans County, averages 3.77 m/s.

Sun versus wind in Caledonia County

Caledonia County gets 3.47 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,013 kWh a year; one kW of the turbine above makes 474. Kilowatt for kilowatt, panels make 2.1 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.