Wind turbine payback in Carteret County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Carteret County, NC averages 6.24 m/s (14 mph). A 10 kW turbine there would make about 21,484 kWh a year, worth $3,210 at NC's 14.94¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Carteret County

A home turbine is not worth buying for savings in Carteret County unless your spot is far windier than the county average, 7.9 m/s at the hub against 6.24 m/s here. Per kW, solar panels would make about 1,299 kWh a year here against the turbine's 2,148, so get a solar quote first.

What would have to change

Against the rest of NC

Carteret County is the 541st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NC is Dare County at 6.91 m/s, payback 25 years.

Month by month in Carteret County

March is the strongest month here, at 7.04 m/s and about 2,320 kWh. August is the weakest, 5.00 m/s and 1,062 kWh, so the best month makes 2.2 times the worst. November to March brings in 50% of the year's output in Carteret County.

MonthWind at 30 mOutputWorth
January6.97 m/s2,280 kWh$341
February7.13 m/s2,147 kWh$321
March7.04 m/s2,320 kWh$347
April6.95 m/s2,196 kWh$328
May6.05 m/s1,708 kWh$255
June5.54 m/s1,341 kWh$200
July5.51 m/s1,369 kWh$205
August5.00 m/s1,062 kWh$159
September5.80 m/s1,499 kWh$224
October5.89 m/s1,602 kWh$239
November6.41 m/s1,869 kWh$279
December6.68 m/s2,102 kWh$314

What a taller tower would buy

Measured at 10 m the wind in Carteret County averages 5.43 m/s; at 50 m it is 6.66 m/s. That gives a shear exponent of 0.127, typical of very open, smooth ground where height adds little. Going from 20 m to 50 m takes output from 19,174 to 24,582 kWh a year, 28% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.93 m/s19,174 kWh35 years
30 m6.24 m/s21,496 kWh31 years
40 m6.47 m/s23,215 kWh29 years
50 m6.66 m/s24,582 kWh27 years

Counties around Carteret County

None of the 6 closest counties is windier than Carteret County.

Sun versus wind in Carteret County

Carteret County gets 4.45 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,299 kWh a year; one kW of the turbine above makes 2,148. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.