TurbinePayback

Wind Turbine Payback in Chase County, NE

Wind turbine payback in Chase County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Chase County, NE averages 6.23 m/s (13.9 mph). A 10 kW turbine there would make about 21,410 kWh a year, worth $2,766 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 36 years, and the turbine is built to last about 20.

What to do in Chase County

A home turbine is not worth buying for savings in Chase County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.23 m/s here. Per kW, solar panels would make about 1,364 kWh a year here against the turbine's 2,141, so get a solar quote first.

What would have to change

Against the rest of NE

Chase County is the 550th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Chase County

April is the strongest month here, at 6.90 m/s and about 2,166 kWh. August is the weakest, 5.41 m/s and 1,309 kWh, so the best month makes 1.7 times the worst. November to March brings in 45% of the year's output in Chase County.

MonthWind at 30 mOutputWorth
January6.51 m/s1,995 kWh$258
February6.47 m/s1,776 kWh$229
March6.61 m/s2,056 kWh$266
April6.90 m/s2,166 kWh$280
May6.24 m/s1,827 kWh$236
June5.85 m/s1,529 kWh$198
July5.45 m/s1,331 kWh$172
August5.41 m/s1,309 kWh$169
September5.98 m/s1,605 kWh$207
October6.42 m/s1,939 kWh$251
November6.48 m/s1,914 kWh$247
December6.45 m/s1,956 kWh$253

What a taller tower would buy

Measured at 10 m the wind in Chase County averages 4.87 m/s; at 50 m it is 6.98 m/s. That gives a shear exponent of 0.224, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,381 to 26,900 kWh a year, 55% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.68 m/s17,381 kWh45 years
30 m6.23 m/s21,375 kWh36 years
40 m6.64 m/s24,433 kWh32 years
50 m6.98 m/s26,900 kWh29 years

Counties around Chase County

3 of the 6 closest counties are windier at turbine height; the windiest, Perkins County, averages 6.3 m/s.

Sun versus wind in Chase County

Chase County gets 4.67 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,364 kWh a year; one kW of the turbine above makes 2,141. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.6 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.