TurbinePayback

Wind Turbine Payback in Hayes County, NE

Wind turbine payback in Hayes County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Hayes County, NE averages 6.27 m/s (14 mph). A 10 kW turbine there would make about 21,706 kWh a year, worth $2,804 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 36 years, and the turbine is built to last about 20.

What to do in Hayes County

A home turbine is not worth buying for savings in Hayes County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.27 m/s here. Per kW, solar panels would make about 1,364 kWh a year here against the turbine's 2,171, so get a solar quote first.

What would have to change

Against the rest of NE

Hayes County is the 510th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Hayes County

April is the strongest month here, at 6.98 m/s and about 2,212 kWh. August is the weakest, 5.46 m/s and 1,340 kWh, so the best month makes 1.7 times the worst. November to March brings in 44% of the year's output in Hayes County.

MonthWind at 30 mOutputWorth
January6.41 m/s1,932 kWh$250
February6.44 m/s1,760 kWh$227
March6.62 m/s2,066 kWh$267
April6.98 m/s2,212 kWh$286
May6.36 m/s1,898 kWh$245
June5.96 m/s1,598 kWh$206
July5.56 m/s1,400 kWh$181
August5.46 m/s1,340 kWh$173
September6.13 m/s1,701 kWh$220
October6.47 m/s1,971 kWh$255
November6.44 m/s1,886 kWh$244
December6.36 m/s1,898 kWh$245

What a taller tower would buy

Measured at 10 m the wind in Hayes County averages 4.91 m/s; at 50 m it is 7.02 m/s. That gives a shear exponent of 0.222, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,696 to 27,186 kWh a year, 54% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.73 m/s17,696 kWh44 years
30 m6.27 m/s21,687 kWh36 years
40 m6.68 m/s24,733 kWh31 years
50 m7.02 m/s27,186 kWh29 years

Counties around Hayes County

4 of the 6 closest counties are windier at turbine height; the windiest, Lincoln County, averages 6.5 m/s.

Sun versus wind in Hayes County

Hayes County gets 4.67 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,364 kWh a year; one kW of the turbine above makes 2,171. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.6 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.