Wind turbine payback in Clay County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Clay County, MN averages 6.45 m/s (14.4 mph). A 10 kW turbine there would make about 23,038 kWh a year, worth $3,787 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 26 years, and the turbine is built to last about 20.

What to do in Clay County

A home turbine is not worth buying for savings in Clay County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.45 m/s here. Per kW, solar panels would make about 1,142 kWh a year here against the turbine's 2,304, so get a solar quote first.

What would have to change

Against the rest of MN

Clay County is the 257th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Clay County

April is the strongest month here, at 7.05 m/s and about 2,251 kWh. July is the weakest, 5.62 m/s and 1,434 kWh, so the best month makes 1.6 times the worst. November to March brings in 42% of the year's output in Clay County.

MonthWind at 30 mOutputWorth
January6.44 m/s1,948 kWh$320
February6.44 m/s1,764 kWh$290
March6.71 m/s2,116 kWh$348
April7.05 m/s2,251 kWh$370
May6.81 m/s2,183 kWh$359
June6.19 m/s1,737 kWh$286
July5.62 m/s1,434 kWh$236
August5.72 m/s1,501 kWh$247
September6.58 m/s1,972 kWh$324
October6.88 m/s2,222 kWh$365
November6.63 m/s2,005 kWh$330
December6.33 m/s1,880 kWh$309

What a taller tower would buy

Measured at 10 m the wind in Clay County averages 5.14 m/s; at 50 m it is 7.16 m/s. That gives a shear exponent of 0.206, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,174 to 28,179 kWh a year, 47% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.93 m/s19,174 kWh32 years
30 m6.44 m/s23,000 kWh26 years
40 m6.84 m/s25,880 kWh24 years
50 m7.16 m/s28,179 kWh22 years

Counties around Clay County

2 of the 6 closest counties are windier at turbine height; the windiest, Becker County, averages 6.62 m/s.

Sun versus wind in Clay County

Clay County gets 3.91 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,142 kWh a year; one kW of the turbine above makes 2,304. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.