No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Conecuh County, AL averages 2.95 m/s (6.6 mph). A 10 kW turbine there would make about 2,455 kWh a year, worth $405 at AL's 16.51¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Conecuh County

A home turbine is not worth buying for savings in Conecuh County unless your spot is far windier than the county average, 7.5 m/s at the hub against 2.95 m/s here. Per kW, solar panels would make about 1,372 kWh a year here against the turbine's 246, so get a solar quote first.

What would have to change

Against the rest of AL

Conecuh County is the 3,083rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AL is Mobile County at 4.72 m/s, payback 57 years.

Month by month in Conecuh County

March is the strongest month here, at 3.35 m/s and about 319 kWh. July is the weakest, 2.34 m/s and 89 kWh, so the best month makes 3.6 times the worst. November to March brings in 55% of the year's output in Conecuh County.

MonthWind at 30 mOutputWorth
January3.26 m/s291 kWh$48
February3.30 m/s273 kWh$45
March3.35 m/s319 kWh$53
April3.30 m/s293 kWh$48
May2.90 m/s196 kWh$32
June2.49 m/s109 kWh$18
July2.34 m/s89 kWh$15
August2.37 m/s93 kWh$15
September2.78 m/s165 kWh$27
October3.05 m/s233 kWh$38
November3.23 m/s273 kWh$45
December3.18 m/s269 kWh$44

What a taller tower would buy

Measured at 10 m the wind in Conecuh County averages 1.72 m/s; at 50 m it is 3.8 m/s. That gives a shear exponent of 0.493, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,189 to 5,614 kWh a year, 372% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.42 m/s1,189 kWhover 100 years
30 m2.95 m/s2,467 kWhover 100 years
40 m3.4 m/s3,958 kWhover 100 years
50 m3.8 m/s5,614 kWhover 100 years

Counties around Conecuh County

5 of the 6 closest counties are windier at turbine height; the windiest, Covington County, averages 3.69 m/s.

Sun versus wind in Conecuh County

Conecuh County gets 4.7 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,372 kWh a year; one kW of the turbine above makes 246. Kilowatt for kilowatt, panels make 5.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.