TurbinePayback

Wind Turbine Payback in Contra Costa County, CA

Wind turbine payback in Contra Costa County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Contra Costa County, CA averages 4.85 m/s (10.8 mph). A 10 kW turbine there would make about 11,537 kWh a year, worth $3,759 at CA's 32.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 27 years, and the turbine is built to last about 20.

What to do in Contra Costa County

A home turbine is not worth buying for savings in Contra Costa County unless your spot is far windier than the county average, 5.4 m/s at the hub against 4.85 m/s here. Per kW, solar panels would make about 1,553 kWh a year here against the turbine's 1,154, so get a solar quote first.

What would have to change

Against the rest of CA

Contra Costa County is the 1,529th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CA is San Francisco County at 6.53 m/s, payback 13 years.

Month by month in Contra Costa County

July is the strongest month here, at 5.72 m/s and about 1,497 kWh. November is the weakest, 3.94 m/s and 514 kWh, so the best month makes 2.9 times the worst. November to March brings in 28% of the year's output in Contra Costa County.

MonthWind at 30 mOutputWorth
January3.91 m/s520 kWh$169
February4.46 m/s698 kWh$227
March4.64 m/s867 kWh$282
April5.13 m/s1,103 kWh$359
May5.56 m/s1,396 kWh$455
June5.75 m/s1,465 kWh$477
July5.72 m/s1,497 kWh$488
August5.44 m/s1,324 kWh$431
September4.98 m/s1,017 kWh$331
October4.49 m/s787 kWh$256
November3.94 m/s514 kWh$167
December4.23 m/s663 kWh$216

What a taller tower would buy

Measured at 10 m the wind in Contra Costa County averages 3.91 m/s; at 50 m it is 5.36 m/s. That gives a shear exponent of 0.196, typical of ordinary open country. Going from 20 m to 50 m takes output from 9,213 to 15,034 kWh a year, 63% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.48 m/s9,213 kWh33 years
30 m4.85 m/s11,533 kWh27 years
40 m5.13 m/s13,426 kWh23 years
50 m5.36 m/s15,034 kWh20 years

Counties around Contra Costa County

1 of the 6 closest counties is windier at turbine height; the windiest, San Mateo County, averages 5.02 m/s.

Sun versus wind in Contra Costa County

Contra Costa County gets 5.32 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,553 kWh a year; one kW of the turbine above makes 1,154. Kilowatt for kilowatt, panels make 1.3 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.