Wind Turbine Payback in Cooper County, MO

Wind turbine payback in Cooper County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Cooper County, MO averages 5.43 m/s (12.1 mph). A 10 kW turbine there would make about 15,534 kWh a year, worth $2,218 at MO's 14.28¢/kWh. Against an installed cost of about $100,000, that is a payback of 45 years, and the turbine is built to last about 20.

What to do in Cooper County

A home turbine is not worth buying for savings in Cooper County unless your spot is far windier than the county average, 8.2 m/s at the hub against 5.43 m/s here. Per kW, solar panels would make about 1,238 kWh a year here against the turbine's 1,553, so get a solar quote first.

What would have to change

Against the rest of MO

Cooper County is the 1,252nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MO is Atchison County at 6.17 m/s, payback 33 years.

Month by month in Cooper County

April is the strongest month here, at 6.27 m/s and about 1,786 kWh. July is the weakest, 4.28 m/s and 686 kWh, so the best month makes 2.6 times the worst. November to March brings in 51% of the year's output in Cooper County.

MonthWind at 30 mOutputWorth
January5.95 m/s1,641 kWh$234
February5.93 m/s1,473 kWh$210
March6.15 m/s1,768 kWh$252
April6.27 m/s1,786 kWh$255
May5.39 m/s1,293 kWh$185
June4.88 m/s964 kWh$138
July4.28 m/s686 kWh$98
August4.30 m/s694 kWh$99
September4.76 m/s903 kWh$129
October5.61 m/s1,428 kWh$204
November5.92 m/s1,572 kWh$224
December5.80 m/s1,548 kWh$221

What a taller tower would buy

Measured at 10 m the wind in Cooper County averages 4.1 m/s; at 50 m it is 6.19 m/s. That gives a shear exponent of 0.256, typical of ordinary open country. Going from 20 m to 50 m takes output from 11,838 to 21,113 kWh a year, 78% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.9 m/s11,838 kWh59 years
30 m5.43 m/s15,542 kWh45 years
40 m5.85 m/s18,568 kWh38 years
50 m6.19 m/s21,113 kWh33 years

Counties around Cooper County

1 of the 6 closest counties is windier at turbine height; the windiest, Saline County, averages 5.74 m/s.

Sun versus wind in Cooper County

Cooper County gets 4.24 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,238 kWh a year; one kW of the turbine above makes 1,553. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.3 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.