TurbinePayback

Wind Turbine Payback in Morgan County, MO

Wind turbine payback in Morgan County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Morgan County, MO averages 4.81 m/s (10.8 mph). A 10 kW turbine there would make about 11,276 kWh a year, worth $1,610 at MO's 14.28¢/kWh. Against an installed cost of about $100,000, that is a payback of 62 years, and the turbine is built to last about 20.

What to do in Morgan County

A home turbine is not worth buying for savings in Morgan County unless your spot is far windier than the county average, 8.2 m/s at the hub against 4.81 m/s here. Per kW, solar panels would make about 1,238 kWh a year here against the turbine's 1,128, so get a solar quote first.

What would have to change

Against the rest of MO

Morgan County is the 1,557th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MO is Atchison County at 6.17 m/s, payback 33 years.

Month by month in Morgan County

March is the strongest month here, at 5.54 m/s and about 1,384 kWh. July is the weakest, 3.73 m/s and 450 kWh, so the best month makes 3.1 times the worst. November to March brings in 53% of the year's output in Morgan County.

MonthWind at 30 mOutputWorth
January5.33 m/s1,259 kWh$180
February5.38 m/s1,166 kWh$167
March5.54 m/s1,384 kWh$198
April5.57 m/s1,360 kWh$194
May4.73 m/s915 kWh$131
June4.29 m/s666 kWh$95
July3.73 m/s450 kWh$64
August3.79 m/s473 kWh$68
September4.15 m/s605 kWh$86
October4.87 m/s991 kWh$142
November5.19 m/s1,135 kWh$162
December5.13 m/s1,137 kWh$162

What a taller tower would buy

Measured at 10 m the wind in Morgan County averages 3.44 m/s; at 50 m it is 5.62 m/s. That gives a shear exponent of 0.305, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 7,896 to 16,907 kWh a year, 114% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.25 m/s7,896 kWh89 years
30 m4.81 m/s11,271 kWh62 years
40 m5.25 m/s14,258 kWh49 years
50 m5.62 m/s16,907 kWh41 years

Counties around Morgan County

1 of the 6 closest counties is windier at turbine height; the windiest, Cooper County, averages 5.43 m/s.

Sun versus wind in Morgan County

Morgan County gets 4.24 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,238 kWh a year; one kW of the turbine above makes 1,128. Kilowatt for kilowatt, panels make 1.1 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.