TurbinePayback

Wind Turbine Payback in Custer County, MT

Wind turbine payback in Custer County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Custer County, MT averages 6.09 m/s (13.6 mph). A 10 kW turbine there would make about 20,371 kWh a year, worth $2,878 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Custer County

A home turbine is not worth buying for savings in Custer County unless your spot is far windier than the county average, 8.2 m/s at the hub against 6.09 m/s here. Per kW, solar panels would make about 1,209 kWh a year here against the turbine's 2,037, so get a solar quote first.

What would have to change

Against the rest of MT

Custer County is the 701st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Custer County

January is the strongest month here, at 6.63 m/s and about 2,071 kWh. July is the weakest, 5.36 m/s and 1,277 kWh, so the best month makes 1.6 times the worst. November to March brings in 46% of the year's output in Custer County.

MonthWind at 30 mOutputWorth
January6.63 m/s2,071 kWh$293
February6.03 m/s1,530 kWh$216
March6.24 m/s1,824 kWh$258
April6.28 m/s1,793 kWh$253
May6.09 m/s1,728 kWh$244
June5.78 m/s1,487 kWh$210
July5.36 m/s1,277 kWh$180
August5.46 m/s1,337 kWh$189
September5.80 m/s1,498 kWh$212
October6.42 m/s1,937 kWh$274
November6.53 m/s1,940 kWh$274
December6.45 m/s1,959 kWh$277

What a taller tower would buy

Measured at 10 m the wind in Custer County averages 4.81 m/s; at 50 m it is 6.79 m/s. That gives a shear exponent of 0.214, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,623 to 25,529 kWh a year, 54% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.58 m/s16,623 kWh43 years
30 m6.09 m/s20,348 kWh35 years
40 m6.47 m/s23,211 kWh31 years
50 m6.79 m/s25,529 kWh28 years

Counties around Custer County

5 of the 6 closest counties are windier at turbine height; the windiest, Fallon County, averages 6.64 m/s.

Sun versus wind in Custer County

Custer County gets 4.14 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,209 kWh a year; one kW of the turbine above makes 2,037. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.