TurbinePayback

Wind Turbine Payback in De Baca County, NM

Wind turbine payback in De Baca County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in De Baca County, NM averages 6.1 m/s (13.6 mph). A 10 kW turbine there would make about 20,446 kWh a year, worth $3,136 at NM's 15.34¢/kWh. Against an installed cost of about $100,000, that is a payback of 32 years, and the turbine is built to last about 20.

What to do in De Baca County

A home turbine is not worth buying for savings in De Baca County unless your spot is far windier than the county average, 7.8 m/s at the hub against 6.1 m/s here. Per kW, solar panels would make about 1,626 kWh a year here against the turbine's 2,045, so get a solar quote first.

What would have to change

Against the rest of NM

De Baca County is the 685th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NM is Union County at 6.75 m/s, payback 26 years.

Month by month in De Baca County

April is the strongest month here, at 7.04 m/s and about 2,248 kWh. August is the weakest, 4.68 m/s and 889 kWh, so the best month makes 2.5 times the worst. November to March brings in 49% of the year's output in De Baca County.

MonthWind at 30 mOutputWorth
January6.52 m/s2,000 kWh$307
February6.73 m/s1,926 kWh$295
March6.81 m/s2,182 kWh$335
April7.04 m/s2,248 kWh$345
May6.36 m/s1,899 kWh$291
June5.93 m/s1,577 kWh$242
July4.97 m/s1,047 kWh$161
August4.68 m/s889 kWh$136
September5.39 m/s1,252 kWh$192
October5.92 m/s1,624 kWh$249
November6.37 m/s1,843 kWh$283
December6.57 m/s2,033 kWh$312

What a taller tower would buy

Measured at 10 m the wind in De Baca County averages 4.75 m/s; at 50 m it is 6.85 m/s. That gives a shear exponent of 0.227, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,497 to 25,964 kWh a year, 57% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.56 m/s16,497 kWh40 years
30 m6.1 m/s20,446 kWh32 years
40 m6.51 m/s23,493 kWh28 years
50 m6.85 m/s25,964 kWh25 years

Counties around De Baca County

3 of the 6 closest counties are windier at turbine height; the windiest, Curry County, averages 6.41 m/s.

Sun versus wind in De Baca County

De Baca County gets 5.57 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,626 kWh a year; one kW of the turbine above makes 2,045. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.3 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.