Wind Turbine Payback in Lincoln County, NM

Wind turbine payback in Lincoln County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Lincoln County, NM averages 5.12 m/s (11.5 mph). A 10 kW turbine there would make about 13,353 kWh a year, worth $2,048 at NM's 15.34¢/kWh. Against an installed cost of about $100,000, that is a payback of 49 years, and the turbine is built to last about 20.

What to do in Lincoln County

A home turbine is not worth buying for savings in Lincoln County unless your spot is far windier than the county average, 7.8 m/s at the hub against 5.12 m/s here. Per kW, solar panels would make about 1,626 kWh a year here against the turbine's 1,335, so get a solar quote first.

What would have to change

Against the rest of NM

Lincoln County is the 1,403rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NM is Union County at 6.75 m/s, payback 26 years.

Month by month in Lincoln County

April is the strongest month here, at 6.51 m/s and about 1,932 kWh. August is the weakest, 3.50 m/s and 366 kWh, so the best month makes 5.3 times the worst. November to March brings in 51% of the year's output in Lincoln County.

MonthWind at 30 mOutputWorth
January5.43 m/s1,322 kWh$203
February5.96 m/s1,487 kWh$228
March6.00 m/s1,674 kWh$257
April6.51 m/s1,932 kWh$296
May5.69 m/s1,480 kWh$227
June4.81 m/s929 kWh$143
July3.66 m/s425 kWh$65
August3.50 m/s366 kWh$56
September4.17 m/s613 kWh$94
October4.93 m/s1,025 kWh$157
November5.36 m/s1,238 kWh$190
December5.53 m/s1,381 kWh$212

What a taller tower would buy

Measured at 10 m the wind in Lincoln County averages 3.94 m/s; at 50 m it is 5.79 m/s. That gives a shear exponent of 0.239, typical of ordinary open country. Going from 20 m to 50 m takes output from 10,265 to 18,153 kWh a year, 77% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.65 m/s10,265 kWh64 years
30 m5.12 m/s13,384 kWh49 years
40 m5.49 m/s15,960 kWh41 years
50 m5.79 m/s18,153 kWh36 years

Counties around Lincoln County

5 of the 6 closest counties are windier at turbine height; the windiest, Torrance County, averages 6.4 m/s.

Sun versus wind in Lincoln County

Lincoln County gets 5.57 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,626 kWh a year; one kW of the turbine above makes 1,335. Kilowatt for kilowatt, panels make 1.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.