Wind Turbine Payback in Douglas County, MN

Wind turbine payback in Douglas County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Douglas County, MN averages 6.52 m/s (14.6 mph). A 10 kW turbine there would make about 23,554 kWh a year, worth $3,872 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 26 years, and the turbine is built to last about 20.

What to do in Douglas County

A home turbine is not worth buying for savings in Douglas County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.52 m/s here. Per kW, solar panels would make about 1,133 kWh a year here against the turbine's 2,355, so get a solar quote first.

What would have to change

Against the rest of MN

Douglas County is the 180th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Douglas County

April is the strongest month here, at 7.18 m/s and about 2,327 kWh. July is the weakest, 5.58 m/s and 1,413 kWh, so the best month makes 1.6 times the worst. November to March brings in 43% of the year's output in Douglas County.

MonthWind at 30 mOutputWorth
January6.62 m/s2,063 kWh$339
February6.68 m/s1,899 kWh$312
March6.79 m/s2,169 kWh$357
April7.18 m/s2,327 kWh$383
May6.85 m/s2,208 kWh$363
June6.20 m/s1,739 kWh$286
July5.58 m/s1,413 kWh$232
August5.66 m/s1,463 kWh$241
September6.61 m/s1,991 kWh$327
October6.94 m/s2,258 kWh$371
November6.72 m/s2,056 kWh$338
December6.47 m/s1,967 kWh$323

What a taller tower would buy

Measured at 10 m the wind in Douglas County averages 5.22 m/s; at 50 m it is 7.23 m/s. That gives a shear exponent of 0.202, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,766 to 28,671 kWh a year, 45% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.01 m/s19,766 kWh31 years
30 m6.52 m/s23,563 kWh26 years
40 m6.91 m/s26,407 kWh23 years
50 m7.23 m/s28,671 kWh21 years

Counties around Douglas County

1 of the 6 closest counties is windier at turbine height; the windiest, Otter Tail County, averages 6.59 m/s.

Sun versus wind in Douglas County

Douglas County gets 3.88 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,133 kWh a year; one kW of the turbine above makes 2,355. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.