TurbinePayback

Wind Turbine Payback in Douglas County, WA

Wind turbine payback in Douglas County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Douglas County, WA averages 3.61 m/s (8.1 mph). A 10 kW turbine there would make about 4,778 kWh a year, worth $689 at WA's 14.42¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Douglas County

A home turbine is not worth buying for savings in Douglas County unless your spot is far windier than the county average, 8.1 m/s at the hub against 3.61 m/s here. Per kW, solar panels would make about 1,200 kWh a year here against the turbine's 478, so get a solar quote first.

What would have to change

Against the rest of WA

Douglas County is the 2,382nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WA is Columbia County at 5.18 m/s, payback 50 years.

Month by month in Douglas County

April is the strongest month here, at 3.92 m/s and about 508 kWh. December is the weakest, 3.22 m/s and 279 kWh, so the best month makes 1.8 times the worst. November to March brings in 36% of the year's output in Douglas County.

MonthWind at 30 mOutputWorth
January3.22 m/s281 kWh$41
February3.55 m/s348 kWh$50
March3.88 m/s507 kWh$73
April3.92 m/s508 kWh$73
May3.75 m/s459 kWh$66
June3.89 m/s498 kWh$72
July3.84 m/s493 kWh$71
August3.67 m/s426 kWh$61
September3.54 m/s370 kWh$53
October3.52 m/s373 kWh$54
November3.39 m/s322 kWh$46
December3.22 m/s279 kWh$40

What a taller tower would buy

Measured at 10 m the wind in Douglas County averages 2.75 m/s; at 50 m it is 4.1 m/s. That gives a shear exponent of 0.248, typical of ordinary open country. Going from 20 m to 50 m takes output from 3,459 to 7,090 kWh a year, 105% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.27 m/s3,459 kWhover 100 years
30 m3.61 m/s4,787 kWhover 100 years
40 m3.88 m/s5,986 kWhover 100 years
50 m4.1 m/s7,090 kWh98 years

Counties around Douglas County

2 of the 6 closest counties are windier at turbine height; the windiest, Lincoln County, averages 4.88 m/s.

Sun versus wind in Douglas County

Douglas County gets 4.11 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,200 kWh a year; one kW of the turbine above makes 478. Kilowatt for kilowatt, panels make 2.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.