Wind Turbine Payback in Douglas County, WI

Wind turbine payback in Douglas County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Douglas County, WI averages 5.45 m/s (12.2 mph). A 10 kW turbine there would make about 15,677 kWh a year, worth $2,986 at WI's 19.05¢/kWh. Against an installed cost of about $100,000, that is a payback of 34 years, and the turbine is built to last about 20.

What to do in Douglas County

A home turbine is not worth buying for savings in Douglas County unless your spot is far windier than the county average, 6.9 m/s at the hub against 5.45 m/s here. Per kW, solar panels would make about 1,042 kWh a year here against the turbine's 1,568, so get a solar quote first.

What would have to change

Against the rest of WI

Douglas County is the 1,247th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WI is Manitowoc County at 7.32 m/s, payback 18 years.

Month by month in Douglas County

January is the strongest month here, at 5.93 m/s and about 1,631 kWh. July is the weakest, 4.63 m/s and 863 kWh, so the best month makes 1.9 times the worst. November to March brings in 48% of the year's output in Douglas County.

MonthWind at 30 mOutputWorth
January5.93 m/s1,631 kWh$311
February6.08 m/s1,559 kWh$297
March5.73 m/s1,504 kWh$287
April5.80 m/s1,498 kWh$285
May5.21 m/s1,186 kWh$226
June4.89 m/s970 kWh$185
July4.63 m/s863 kWh$164
August4.77 m/s934 kWh$178
September5.42 m/s1,271 kWh$242
October5.66 m/s1,460 kWh$278
November5.72 m/s1,450 kWh$276
December5.65 m/s1,455 kWh$277

What a taller tower would buy

Measured at 10 m the wind in Douglas County averages 4.17 m/s; at 50 m it is 6.18 m/s. That gives a shear exponent of 0.244, typical of ordinary open country. Going from 20 m to 50 m takes output from 12,145 to 21,039 kWh a year, 73% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.94 m/s12,145 kWh43 years
30 m5.46 m/s15,719 kWh33 years
40 m5.85 m/s18,613 kWh28 years
50 m6.18 m/s21,039 kWh25 years

Counties around Douglas County

4 of the 6 closest counties are windier at turbine height; the windiest, Carlton County, averages 5.93 m/s.

Sun versus wind in Douglas County

Douglas County gets 3.57 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,042 kWh a year; one kW of the turbine above makes 1,568. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.5 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.