TurbinePayback

Wind Turbine Payback in Sawyer County, WI

Wind turbine payback in Sawyer County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Sawyer County, WI averages 4.85 m/s (10.8 mph). A 10 kW turbine there would make about 11,537 kWh a year, worth $2,198 at WI's 19.05¢/kWh. Against an installed cost of about $100,000, that is a payback of 46 years, and the turbine is built to last about 20.

What to do in Sawyer County

A home turbine is not worth buying for savings in Sawyer County unless your spot is far windier than the county average, 6.9 m/s at the hub against 4.85 m/s here. Per kW, solar panels would make about 1,092 kWh a year here against the turbine's 1,154, so get a solar quote first.

What would have to change

Against the rest of WI

Sawyer County is the 1,529th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WI is Manitowoc County at 7.32 m/s, payback 18 years.

Month by month in Sawyer County

February is the strongest month here, at 5.54 m/s and about 1,252 kWh. July is the weakest, 4.11 m/s and 606 kWh, so the best month makes 2.1 times the worst. November to March brings in 49% of the year's output in Sawyer County.

MonthWind at 30 mOutputWorth
January5.27 m/s1,224 kWh$233
February5.54 m/s1,252 kWh$239
March5.27 m/s1,224 kWh$233
April5.25 m/s1,174 kWh$224
May4.72 m/s909 kWh$173
June4.35 m/s695 kWh$132
July4.11 m/s606 kWh$115
August4.18 m/s637 kWh$121
September4.73 m/s884 kWh$168
October4.93 m/s1,023 kWh$195
November5.00 m/s1,028 kWh$196
December4.94 m/s1,028 kWh$196

What a taller tower would buy

Measured at 10 m the wind in Sawyer County averages 3.52 m/s; at 50 m it is 5.63 m/s. That gives a shear exponent of 0.292, typical of ordinary open country. Going from 20 m to 50 m takes output from 8,223 to 16,980 kWh a year, 106% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.31 m/s8,223 kWh64 years
30 m4.85 m/s11,536 kWh46 years
40 m5.27 m/s14,431 kWh36 years
50 m5.63 m/s16,980 kWh31 years

Counties around Sawyer County

4 of the 6 closest counties are windier at turbine height; the windiest, Barron County, averages 6.03 m/s.

Sun versus wind in Sawyer County

Sawyer County gets 3.74 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,092 kWh a year; one kW of the turbine above makes 1,154. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.