TurbinePayback

Wind Turbine Payback in Edmunds County, SD

Wind turbine payback in Edmunds County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Edmunds County, SD averages 6.46 m/s (14.5 mph). A 10 kW turbine there would make about 23,112 kWh a year, worth $3,370 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 30 years, and the turbine is built to last about 20.

What to do in Edmunds County

A home turbine is not worth buying for savings in Edmunds County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.46 m/s here. Per kW, solar panels would make about 1,197 kWh a year here against the turbine's 2,311, so get a solar quote first.

What would have to change

Against the rest of SD

Edmunds County is the 239th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Edmunds County

October is the strongest month here, at 6.99 m/s and about 2,288 kWh. July is the weakest, 5.65 m/s and 1,453 kWh, so the best month makes 1.6 times the worst. November to March brings in 42% of the year's output in Edmunds County.

MonthWind at 30 mOutputWorth
January6.55 m/s2,016 kWh$294
February6.32 m/s1,694 kWh$247
March6.65 m/s2,083 kWh$304
April6.95 m/s2,193 kWh$320
May6.76 m/s2,150 kWh$313
June6.15 m/s1,711 kWh$249
July5.65 m/s1,453 kWh$212
August5.70 m/s1,486 kWh$217
September6.58 m/s1,973 kWh$288
October6.99 m/s2,288 kWh$334
November6.64 m/s2,011 kWh$293
December6.50 m/s1,988 kWh$290

What a taller tower would buy

Measured at 10 m the wind in Edmunds County averages 5.12 m/s; at 50 m it is 7.19 m/s. That gives a shear exponent of 0.211, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,156 to 28,390 kWh a year, 48% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.93 m/s19,156 kWh36 years
30 m6.46 m/s23,078 kWh30 years
40 m6.86 m/s26,032 kWh26 years
50 m7.19 m/s28,390 kWh24 years

Counties around Edmunds County

3 of the 6 closest counties are windier at turbine height; the windiest, McPherson County, averages 6.65 m/s.

Sun versus wind in Edmunds County

Edmunds County gets 4.1 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,197 kWh a year; one kW of the turbine above makes 2,311. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.