TurbinePayback

Wind Turbine Payback in Campbell County, SD

Wind turbine payback in Campbell County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Campbell County, SD averages 6.57 m/s (14.7 mph). A 10 kW turbine there would make about 23,922 kWh a year, worth $3,488 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 29 years, and the turbine is built to last about 20.

What to do in Campbell County

A home turbine is not worth buying for savings in Campbell County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.57 m/s here. Per kW, solar panels would make about 1,206 kWh a year here against the turbine's 2,392, so get a solar quote first.

What would have to change

Against the rest of SD

Campbell County is the 130th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Campbell County

October is the strongest month here, at 7.09 m/s and about 2,354 kWh. July is the weakest, 5.82 m/s and 1,563 kWh, so the best month makes 1.5 times the worst. November to March brings in 42% of the year's output in Campbell County.

MonthWind at 30 mOutputWorth
January6.60 m/s2,050 kWh$299
February6.36 m/s1,719 kWh$251
March6.81 m/s2,178 kWh$318
April7.07 m/s2,262 kWh$330
May6.88 m/s2,223 kWh$324
June6.31 m/s1,809 kWh$264
July5.82 m/s1,563 kWh$228
August5.91 m/s1,619 kWh$236
September6.69 m/s2,038 kWh$297
October7.09 m/s2,354 kWh$343
November6.73 m/s2,060 kWh$300
December6.54 m/s2,010 kWh$293

What a taller tower would buy

Measured at 10 m the wind in Campbell County averages 5.26 m/s; at 50 m it is 7.29 m/s. That gives a shear exponent of 0.203, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,094 to 29,090 kWh a year, 45% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.05 m/s20,094 kWh34 years
30 m6.57 m/s23,936 kWh29 years
40 m6.97 m/s26,808 kWh26 years
50 m7.29 m/s29,090 kWh24 years

Counties around Campbell County

2 of the 6 closest counties are windier at turbine height; the windiest, McIntosh County, averages 6.65 m/s.

Sun versus wind in Campbell County

Campbell County gets 4.13 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,206 kWh a year; one kW of the turbine above makes 2,392. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.