TurbinePayback

Wind Turbine Payback in El Paso County, CO

Wind turbine payback in El Paso County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in El Paso County, CO averages 5.4 m/s (12.1 mph). A 10 kW turbine there would make about 15,319 kWh a year, worth $2,574 at CO's 16.8¢/kWh. Against an installed cost of about $100,000, that is a payback of 39 years, and the turbine is built to last about 20.

What to do in El Paso County

A home turbine is not worth buying for savings in El Paso County unless your spot is far windier than the county average, 7.4 m/s at the hub against 5.4 m/s here. Per kW, solar panels would make about 1,469 kWh a year here against the turbine's 1,532, so get a solar quote first.

What would have to change

Against the rest of CO

El Paso County is the 1,283rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CO is Baca County at 6.65 m/s, payback 24 years.

Month by month in El Paso County

April is the strongest month here, at 6.25 m/s and about 1,772 kWh. July is the weakest, 4.50 m/s and 793 kWh, so the best month makes 2.2 times the worst. November to March brings in 47% of the year's output in El Paso County.

MonthWind at 30 mOutputWorth
January5.68 m/s1,472 kWh$247
February5.79 m/s1,395 kWh$234
March5.89 m/s1,606 kWh$270
April6.25 m/s1,772 kWh$298
May5.36 m/s1,275 kWh$214
June5.15 m/s1,115 kWh$187
July4.50 m/s793 kWh$133
August4.53 m/s807 kWh$136
September5.03 m/s1,045 kWh$176
October5.43 m/s1,318 kWh$221
November5.59 m/s1,371 kWh$230
December5.62 m/s1,439 kWh$242

What a taller tower would buy

Measured at 10 m the wind in El Paso County averages 4.23 m/s; at 50 m it is 6.05 m/s. That gives a shear exponent of 0.222, typical of ordinary open country. Going from 20 m to 50 m takes output from 12,108 to 20,075 kWh a year, 66% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.94 m/s12,108 kWh49 years
30 m5.4 m/s15,329 kWh39 years
40 m5.76 m/s17,914 kWh33 years
50 m6.05 m/s20,075 kWh30 years

Counties around El Paso County

1 of the 6 closest counties is windier at turbine height; the windiest, Elbert County, averages 5.42 m/s.

Sun versus wind in El Paso County

El Paso County gets 5.03 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,469 kWh a year; one kW of the turbine above makes 1,532. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.