TurbinePayback

Wind Turbine Payback in Teller County, CO

Wind turbine payback in Teller County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Teller County, CO averages 5.09 m/s (11.4 mph). A 10 kW turbine there would make about 13,146 kWh a year, worth $2,209 at CO's 16.8¢/kWh. Against an installed cost of about $100,000, that is a payback of 45 years, and the turbine is built to last about 20.

What to do in Teller County

A home turbine is not worth buying for savings in Teller County unless your spot is far windier than the county average, 7.4 m/s at the hub against 5.09 m/s here. Per kW, solar panels would make about 1,460 kWh a year here against the turbine's 1,315, so get a solar quote first.

What would have to change

Against the rest of CO

Teller County is the 1,408th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CO is Baca County at 6.65 m/s, payback 24 years.

Month by month in Teller County

April is the strongest month here, at 5.82 m/s and about 1,509 kWh. August is the weakest, 4.00 m/s and 560 kWh, so the best month makes 2.7 times the worst. November to March brings in 52% of the year's output in Teller County.

MonthWind at 30 mOutputWorth
January5.67 m/s1,465 kWh$246
February5.84 m/s1,418 kWh$238
March5.66 m/s1,459 kWh$245
April5.82 m/s1,509 kWh$254
May4.91 m/s1,011 kWh$170
June4.70 m/s869 kWh$146
July4.05 m/s580 kWh$97
August4.00 m/s560 kWh$94
September4.54 m/s787 kWh$132
October5.01 m/s1,072 kWh$180
November5.39 m/s1,253 kWh$211
December5.64 m/s1,448 kWh$243

What a taller tower would buy

Measured at 10 m the wind in Teller County averages 4 m/s; at 50 m it is 5.7 m/s. That gives a shear exponent of 0.220, typical of ordinary open country. Going from 20 m to 50 m takes output from 10,316 to 17,492 kWh a year, 70% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.66 m/s10,316 kWh58 years
30 m5.09 m/s13,175 kWh45 years
40 m5.43 m/s15,512 kWh38 years
50 m5.7 m/s17,492 kWh34 years

Counties around Teller County

2 of the 6 closest counties are windier at turbine height; the windiest, El Paso County, averages 5.4 m/s.

Sun versus wind in Teller County

Teller County gets 5 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,460 kWh a year; one kW of the turbine above makes 1,315. Kilowatt for kilowatt, panels make 1.1 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.