TurbinePayback

Wind Turbine Payback in El Paso County, TX

Wind turbine payback in El Paso County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in El Paso County, TX averages 5.01 m/s (11.2 mph). A 10 kW turbine there would make about 12,602 kWh a year, worth $2,020 at TX's 16.03¢/kWh. Against an installed cost of about $100,000, that is a payback of 50 years, and the turbine is built to last about 20.

What to do in El Paso County

A home turbine is not worth buying for savings in El Paso County unless your spot is far windier than the county average, 7.6 m/s at the hub against 5.01 m/s here. Per kW, solar panels would make about 1,723 kWh a year here against the turbine's 1,260, so get a solar quote first.

What would have to change

Against the rest of TX

El Paso County is the 1,449th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TX is Dallam County at 6.82 m/s, payback 24 years.

Month by month in El Paso County

April is the strongest month here, at 6.27 m/s and about 1,783 kWh. August is the weakest, 3.98 m/s and 549 kWh, so the best month makes 3.2 times the worst. November to March brings in 42% of the year's output in El Paso County.

MonthWind at 30 mOutputWorth
January4.81 m/s957 kWh$153
February5.32 m/s1,131 kWh$181
March5.65 m/s1,455 kWh$233
April6.27 m/s1,783 kWh$286
May5.76 m/s1,522 kWh$244
June5.09 m/s1,079 kWh$173
July4.30 m/s694 kWh$111
August3.98 m/s549 kWh$88
September4.55 m/s792 kWh$127
October4.80 m/s952 kWh$153
November4.92 m/s984 kWh$158
December4.68 m/s889 kWh$143

What a taller tower would buy

Measured at 10 m the wind in El Paso County averages 3.95 m/s; at 50 m it is 5.59 m/s. That gives a shear exponent of 0.216, typical of ordinary open country. Going from 20 m to 50 m takes output from 9,862 to 16,689 kWh a year, 69% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.59 m/s9,862 kWh63 years
30 m5.01 m/s12,575 kWh50 years
40 m5.33 m/s14,799 kWh42 years
50 m5.59 m/s16,689 kWh37 years

Counties around El Paso County

5 of the 6 closest counties are windier at turbine height; the windiest, Culberson County, averages 5.63 m/s.

Sun versus wind in El Paso County

El Paso County gets 5.9 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,723 kWh a year; one kW of the turbine above makes 1,260. Kilowatt for kilowatt, panels make 1.4 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.