Wind turbine payback in Sierra County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Sierra County, NM averages 5.05 m/s (11.3 mph). A 10 kW turbine there would make about 12,873 kWh a year, worth $1,975 at NM's 15.34¢/kWh. Against an installed cost of about $100,000, that is a payback of 51 years, and the turbine is built to last about 20.

What to do in Sierra County

A home turbine is not worth buying for savings in Sierra County unless your spot is far windier than the county average, 7.8 m/s at the hub against 5.05 m/s here. Per kW, solar panels would make about 1,641 kWh a year here against the turbine's 1,287, so get a solar quote first.

What would have to change

Against the rest of NM

Sierra County is the 1,430th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NM is Union County at 6.75 m/s, payback 26 years.

Month by month in Sierra County

April is the strongest month here, at 6.46 m/s and about 1,901 kWh. August is the weakest, 3.71 m/s and 442 kWh, so the best month makes 4.3 times the worst. November to March brings in 44% of the year's output in Sierra County.

MonthWind at 30 mOutputWorth
January4.89 m/s1,003 kWh$154
February5.48 m/s1,220 kWh$187
March5.91 m/s1,620 kWh$249
April6.46 m/s1,901 kWh$292
May6.02 m/s1,687 kWh$259
June5.35 m/s1,230 kWh$189
July3.90 m/s518 kWh$79
August3.71 m/s442 kWh$68
September4.25 m/s647 kWh$99
October4.88 m/s998 kWh$153
November4.87 m/s961 kWh$147
December4.88 m/s998 kWh$153

What a taller tower would buy

Measured at 10 m the wind in Sierra County averages 3.86 m/s; at 50 m it is 5.72 m/s. That gives a shear exponent of 0.244, typical of ordinary open country. Going from 20 m to 50 m takes output from 9,787 to 17,638 kWh a year, 80% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.57 m/s9,787 kWh67 years
30 m5.05 m/s12,871 kWh51 years
40 m5.42 m/s15,440 kWh42 years
50 m5.72 m/s17,638 kWh37 years

Counties around Sierra County

5 of the 6 closest counties are windier at turbine height; the windiest, Grant County, averages 5.52 m/s.

Sun versus wind in Sierra County

Sierra County gets 5.62 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,641 kWh a year; one kW of the turbine above makes 1,287. Kilowatt for kilowatt, panels make 1.3 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.