Wind Turbine Payback in Grand County, CO

Wind turbine payback in Grand County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Grand County, CO averages 3.36 m/s (7.5 mph). A 10 kW turbine there would make about 3,794 kWh a year, worth $637 at CO's 16.8¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Grand County

A home turbine is not worth buying for savings in Grand County unless your spot is far windier than the county average, 7.4 m/s at the hub against 3.36 m/s here. Per kW, solar panels would make about 1,372 kWh a year here against the turbine's 379, so get a solar quote first.

What would have to change

Against the rest of CO

Grand County is the 2,665th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CO is Baca County at 6.65 m/s, payback 24 years.

Month by month in Grand County

April is the strongest month here, at 3.84 m/s and about 476 kWh. July is the weakest, 2.56 m/s and 125 kWh, so the best month makes 3.8 times the worst. November to March brings in 54% of the year's output in Grand County.

MonthWind at 30 mOutputWorth
January3.64 m/s415 kWh$70
February3.82 m/s439 kWh$74
March3.75 m/s459 kWh$77
April3.84 m/s476 kWh$80
May3.29 m/s301 kWh$51
June3.17 m/s258 kWh$43
July2.56 m/s125 kWh$21
August2.58 m/s128 kWh$22
September2.91 m/s193 kWh$32
October3.43 m/s343 kWh$58
November3.65 m/s408 kWh$69
December3.70 m/s440 kWh$74

What a taller tower would buy

Measured at 10 m the wind in Grand County averages 2.32 m/s; at 50 m it is 3.99 m/s. That gives a shear exponent of 0.337, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,398 to 6,527 kWh a year, 172% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.93 m/s2,398 kWhover 100 years
30 m3.36 m/s3,790 kWhover 100 years
40 m3.7 m/s5,169 kWhover 100 years
50 m3.99 m/s6,527 kWh91 years

Counties around Grand County

5 of the 6 closest counties are windier at turbine height; the windiest, Gilpin County, averages 4.87 m/s.

Sun versus wind in Grand County

Grand County gets 4.7 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,372 kWh a year; one kW of the turbine above makes 379. Kilowatt for kilowatt, panels make 3.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.