TurbinePayback

Wind Turbine Payback in Summit County, CO

Wind turbine payback in Summit County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Summit County, CO averages 3.59 m/s (8 mph). A 10 kW turbine there would make about 4,694 kWh a year, worth $789 at CO's 16.8¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Summit County

A home turbine is not worth buying for savings in Summit County unless your spot is far windier than the county average, 7.4 m/s at the hub against 3.59 m/s here. Per kW, solar panels would make about 1,407 kWh a year here against the turbine's 469, so get a solar quote first.

What would have to change

Against the rest of CO

Summit County is the 2,419th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CO is Baca County at 6.65 m/s, payback 24 years.

Month by month in Summit County

April is the strongest month here, at 4.19 m/s and about 622 kWh. July is the weakest, 2.55 m/s and 124 kWh, so the best month makes 5.0 times the worst. November to March brings in 54% of the year's output in Summit County.

MonthWind at 30 mOutputWorth
January3.88 m/s508 kWh$85
February4.18 m/s577 kWh$97
March4.02 m/s568 kWh$95
April4.19 m/s622 kWh$104
May3.62 m/s411 kWh$69
June3.40 m/s323 kWh$54
July2.55 m/s124 kWh$21
August2.62 m/s137 kWh$23
September3.07 m/s230 kWh$39
October3.70 m/s439 kWh$74
November3.91 m/s505 kWh$85
December3.96 m/s543 kWh$91

What a taller tower would buy

Measured at 10 m the wind in Summit County averages 2.5 m/s; at 50 m it is 4.25 m/s. That gives a shear exponent of 0.330, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 3,037 to 7,897 kWh a year, 160% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.14 m/s3,037 kWhover 100 years
30 m3.59 m/s4,697 kWhover 100 years
40 m3.95 m/s6,320 kWh94 years
50 m4.25 m/s7,897 kWh75 years

Counties around Summit County

4 of the 6 closest counties are windier at turbine height; the windiest, Park County, averages 5.21 m/s.

Sun versus wind in Summit County

Summit County gets 4.82 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,407 kWh a year; one kW of the turbine above makes 469. Kilowatt for kilowatt, panels make 3.0 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.