TurbinePayback

Wind Turbine Payback in Hardy County, WV

Wind turbine payback in Hardy County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Hardy County, WV averages 3.37 m/s (7.5 mph). A 10 kW turbine there would make about 3,830 kWh a year, worth $597 at WV's 15.58¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Hardy County

A home turbine is not worth buying for savings in Hardy County unless your spot is far windier than the county average, 7.7 m/s at the hub against 3.37 m/s here. Per kW, solar panels would make about 1,139 kWh a year here against the turbine's 383, so get a solar quote first.

What would have to change

Against the rest of WV

Hardy County is the 2,653rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WV is Preston County at 3.73 m/s, payback over 100 years.

Month by month in Hardy County

January is the strongest month here, at 4.20 m/s and about 646 kWh. August is the weakest, 2.45 m/s and 106 kWh, so the best month makes 6.1 times the worst. November to March brings in 63% of the year's output in Hardy County.

MonthWind at 30 mOutputWorth
January4.20 m/s646 kWh$101
February4.26 m/s610 kWh$95
March4.05 m/s579 kWh$90
April3.82 m/s471 kWh$73
May3.09 m/s245 kWh$38
June2.82 m/s172 kWh$27
July2.56 m/s126 kWh$20
August2.45 m/s106 kWh$17
September2.71 m/s149 kWh$23
October3.21 m/s278 kWh$43
November3.55 m/s371 kWh$58
December3.82 m/s483 kWh$75

What a taller tower would buy

Measured at 10 m the wind in Hardy County averages 2.05 m/s; at 50 m it is 4.25 m/s. That gives a shear exponent of 0.453, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,063 to 7,897 kWh a year, 283% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.81 m/s2,063 kWhover 100 years
30 m3.37 m/s3,838 kWhover 100 years
40 m3.84 m/s5,807 kWhover 100 years
50 m4.25 m/s7,897 kWh81 years

Counties around Hardy County

5 of the 6 closest counties are windier at turbine height; the windiest, Page County, averages 3.76 m/s.

Sun versus wind in Hardy County

Hardy County gets 3.9 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,139 kWh a year; one kW of the turbine above makes 383. Kilowatt for kilowatt, panels make 3.0 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.