Wind Turbine Payback in Henderson County, NC

Wind turbine payback in Henderson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Henderson County, NC averages 3.26 m/s (7.3 mph). A 10 kW turbine there would make about 3,436 kWh a year, worth $513 at NC's 14.94¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Henderson County

A home turbine is not worth buying for savings in Henderson County unless your spot is far windier than the county average, 7.9 m/s at the hub against 3.26 m/s here. Per kW, solar panels would make about 1,282 kWh a year here against the turbine's 344, so get a solar quote first.

What would have to change

Against the rest of NC

Henderson County is the 2,801st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NC is Dare County at 6.91 m/s, payback 25 years.

Month by month in Henderson County

January is the strongest month here, at 3.97 m/s and about 546 kWh. August is the weakest, 2.27 m/s and 79 kWh, so the best month makes 6.9 times the worst. November to March brings in 62% of the year's output in Henderson County.

MonthWind at 30 mOutputWorth
January3.97 m/s546 kWh$82
February4.04 m/s518 kWh$77
March3.97 m/s546 kWh$82
April3.87 m/s489 kWh$73
May3.16 m/s264 kWh$39
June2.67 m/s141 kWh$21
July2.41 m/s100 kWh$15
August2.27 m/s79 kWh$12
September2.63 m/s135 kWh$20
October3.14 m/s257 kWh$38
November3.43 m/s334 kWh$50
December3.63 m/s412 kWh$62

What a taller tower would buy

Measured at 10 m the wind in Henderson County averages 2.1 m/s; at 50 m it is 4 m/s. That gives a shear exponent of 0.400, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,977 to 6,577 kWh a year, 233% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.77 m/s1,977 kWhover 100 years
30 m3.26 m/s3,439 kWhover 100 years
40 m3.66 m/s4,984 kWhover 100 years
50 m4 m/s6,577 kWhover 100 years

Counties around Henderson County

1 of the 6 closest counties is windier at turbine height; the windiest, Greenville County, averages 3.48 m/s.

Sun versus wind in Henderson County

Henderson County gets 4.39 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,282 kWh a year; one kW of the turbine above makes 344. Kilowatt for kilowatt, panels make 3.7 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.