TurbinePayback

Wind Turbine Payback in Hill County, TX

Wind turbine payback in Hill County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Hill County, TX averages 5.62 m/s (12.6 mph). A 10 kW turbine there would make about 16,907 kWh a year, worth $2,710 at TX's 16.03¢/kWh. Against an installed cost of about $100,000, that is a payback of 37 years, and the turbine is built to last about 20.

What to do in Hill County

A home turbine is not worth buying for savings in Hill County unless your spot is far windier than the county average, 7.6 m/s at the hub against 5.62 m/s here. Per kW, solar panels would make about 1,405 kWh a year here against the turbine's 1,691, so get a solar quote first.

What would have to change

Against the rest of TX

Hill County is the 1,155th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TX is Dallam County at 6.82 m/s, payback 24 years.

Month by month in Hill County

April is the strongest month here, at 6.49 m/s and about 1,916 kWh. September is the weakest, 4.60 m/s and 815 kWh, so the best month makes 2.4 times the worst. November to March brings in 50% of the year's output in Hill County.

MonthWind at 30 mOutputWorth
January6.04 m/s1,696 kWh$272
February6.24 m/s1,648 kWh$264
March6.38 m/s1,913 kWh$307
April6.49 m/s1,916 kWh$307
May5.83 m/s1,568 kWh$251
June5.25 m/s1,171 kWh$188
July4.81 m/s956 kWh$153
August4.56 m/s824 kWh$132
September4.60 m/s815 kWh$131
October5.43 m/s1,322 kWh$212
November5.94 m/s1,582 kWh$254
December5.96 m/s1,646 kWh$264

What a taller tower would buy

Measured at 10 m the wind in Hill County averages 4.31 m/s; at 50 m it is 6.36 m/s. That gives a shear exponent of 0.242, typical of ordinary open country. Going from 20 m to 50 m takes output from 13,182 to 22,373 kWh a year, 70% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.1 m/s13,182 kWh47 years
30 m5.62 m/s16,910 kWh37 years
40 m6.03 m/s19,894 kWh31 years
50 m6.36 m/s22,373 kWh28 years

Counties around Hill County

5 of the 6 closest counties are windier at turbine height; the windiest, Johnson County, averages 5.79 m/s.

Sun versus wind in Hill County

Hill County gets 4.81 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,405 kWh a year; one kW of the turbine above makes 1,691. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.2 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.