Wind Turbine Payback in Navarro County, TX

Wind turbine payback in Navarro County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Navarro County, TX averages 5.54 m/s (12.4 mph). A 10 kW turbine there would make about 16,326 kWh a year, worth $2,617 at TX's 16.03¢/kWh. Against an installed cost of about $100,000, that is a payback of 38 years, and the turbine is built to last about 20.

What to do in Navarro County

A home turbine is not worth buying for savings in Navarro County unless your spot is far windier than the county average, 7.6 m/s at the hub against 5.54 m/s here. Per kW, solar panels would make about 1,375 kWh a year here against the turbine's 1,633, so get a solar quote first.

What would have to change

Against the rest of TX

Navarro County is the 1,186th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TX is Dallam County at 6.82 m/s, payback 24 years.

Month by month in Navarro County

March is the strongest month here, at 6.33 m/s and about 1,882 kWh. August is the weakest, 4.46 m/s and 771 kWh, so the best month makes 2.4 times the worst. November to March brings in 51% of the year's output in Navarro County.

MonthWind at 30 mOutputWorth
January5.99 m/s1,665 kWh$267
February6.20 m/s1,624 kWh$260
March6.33 m/s1,882 kWh$302
April6.36 m/s1,837 kWh$294
May5.72 m/s1,498 kWh$240
June5.04 m/s1,052 kWh$169
July4.64 m/s867 kWh$139
August4.46 m/s771 kWh$124
September4.56 m/s799 kWh$128
October5.38 m/s1,286 kWh$206
November5.88 m/s1,546 kWh$248
December5.90 m/s1,609 kWh$258

What a taller tower would buy

Measured at 10 m the wind in Navarro County averages 4.25 m/s; at 50 m it is 6.26 m/s. That gives a shear exponent of 0.241, typical of ordinary open country. Going from 20 m to 50 m takes output from 12,667 to 21,632 kWh a year, 71% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.02 m/s12,667 kWh49 years
30 m5.53 m/s16,289 kWh38 years
40 m5.93 m/s19,202 kWh33 years
50 m6.26 m/s21,632 kWh29 years

Counties around Navarro County

3 of the 6 closest counties are windier at turbine height; the windiest, Ellis County, averages 5.68 m/s.

Sun versus wind in Navarro County

Navarro County gets 4.71 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,375 kWh a year; one kW of the turbine above makes 1,633. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.2 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.