Wind Turbine Payback in Hinsdale County, CO

Wind turbine payback in Hinsdale County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Hinsdale County, CO averages 3.36 m/s (7.5 mph). A 10 kW turbine there would make about 3,794 kWh a year, worth $637 at CO's 16.8¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Hinsdale County

A home turbine is not worth buying for savings in Hinsdale County unless your spot is far windier than the county average, 7.4 m/s at the hub against 3.36 m/s here. Per kW, solar panels would make about 1,472 kWh a year here against the turbine's 379, so get a solar quote first.

What would have to change

Against the rest of CO

Hinsdale County is the 2,665th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CO is Baca County at 6.65 m/s, payback 24 years.

Month by month in Hinsdale County

April is the strongest month here, at 4.22 m/s and about 634 kWh. July is the weakest, 2.43 m/s and 104 kWh, so the best month makes 6.1 times the worst. November to March brings in 45% of the year's output in Hinsdale County.

MonthWind at 30 mOutputWorth
January3.22 m/s281 kWh$47
February3.74 m/s410 kWh$69
March3.78 m/s467 kWh$78
April4.22 m/s634 kWh$107
May3.75 m/s457 kWh$77
June3.55 m/s374 kWh$63
July2.43 m/s104 kWh$17
August2.46 m/s108 kWh$18
September2.97 m/s206 kWh$35
October3.39 m/s333 kWh$56
November3.44 m/s335 kWh$56
December3.42 m/s341 kWh$57

What a taller tower would buy

Measured at 10 m the wind in Hinsdale County averages 2.36 m/s; at 50 m it is 3.96 m/s. That gives a shear exponent of 0.322, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,450 to 6,378 kWh a year, 160% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.95 m/s2,450 kWhover 100 years
30 m3.36 m/s3,791 kWhover 100 years
40 m3.69 m/s5,101 kWhover 100 years
50 m3.96 m/s6,378 kWh93 years

Counties around Hinsdale County

4 of the 6 closest counties are windier at turbine height; the windiest, Rio Grande County, averages 4.91 m/s.

Sun versus wind in Hinsdale County

Hinsdale County gets 5.04 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,472 kWh a year; one kW of the turbine above makes 379. Kilowatt for kilowatt, panels make 3.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.