No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Howard County, NE averages 6.51 m/s (14.6 mph). A 10 kW turbine there would make about 23,481 kWh a year, worth $3,034 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 33 years, and the turbine is built to last about 20.

What to do in Howard County

A home turbine is not worth buying for savings in Howard County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.51 m/s here. Per kW, solar panels would make about 1,270 kWh a year here against the turbine's 2,348, so get a solar quote first.

What would have to change

Against the rest of NE

Howard County is the 193rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Howard County

April is the strongest month here, at 7.34 m/s and about 2,421 kWh. August is the weakest, 5.40 m/s and 1,298 kWh, so the best month makes 1.9 times the worst. November to March brings in 45% of the year's output in Howard County.

MonthWind at 30 mOutputWorth
January6.70 m/s2,112 kWh$273
February6.74 m/s1,928 kWh$249
March6.97 m/s2,277 kWh$294
April7.34 m/s2,421 kWh$313
May6.63 m/s2,068 kWh$267
June6.20 m/s1,741 kWh$225
July5.44 m/s1,325 kWh$171
August5.40 m/s1,298 kWh$168
September6.51 m/s1,931 kWh$249
October6.78 m/s2,162 kWh$279
November6.80 m/s2,103 kWh$272
December6.63 m/s2,068 kWh$267

What a taller tower would buy

Measured at 10 m the wind in Howard County averages 5.11 m/s; at 50 m it is 7.29 m/s. That gives a shear exponent of 0.221, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,361 to 29,090 kWh a year, 50% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.95 m/s19,361 kWh40 years
30 m6.51 m/s23,494 kWh33 years
40 m6.94 m/s26,607 kWh29 years
50 m7.29 m/s29,090 kWh27 years

Counties around Howard County

3 of the 6 closest counties are windier at turbine height; the windiest, Greeley County, averages 6.57 m/s.

Sun versus wind in Howard County

Howard County gets 4.35 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,270 kWh a year; one kW of the turbine above makes 2,348. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.