Wind Turbine Payback in Nance County, NE

Wind turbine payback in Nance County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Nance County, NE averages 6.55 m/s (14.7 mph). A 10 kW turbine there would make about 23,775 kWh a year, worth $3,072 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 33 years, and the turbine is built to last about 20.

What to do in Nance County

A home turbine is not worth buying for savings in Nance County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.55 m/s here. Per kW, solar panels would make about 1,256 kWh a year here against the turbine's 2,378, so get a solar quote first.

What would have to change

Against the rest of NE

Nance County is the 151st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Nance County

April is the strongest month here, at 7.37 m/s and about 2,437 kWh. August is the weakest, 5.37 m/s and 1,281 kWh, so the best month makes 1.9 times the worst. November to March brings in 45% of the year's output in Nance County.

MonthWind at 30 mOutputWorth
January6.83 m/s2,196 kWh$284
February6.84 m/s1,988 kWh$257
March7.03 m/s2,316 kWh$299
April7.37 m/s2,437 kWh$315
May6.71 m/s2,119 kWh$274
June6.14 m/s1,703 kWh$220
July5.39 m/s1,292 kWh$167
August5.37 m/s1,281 kWh$166
September6.52 m/s1,937 kWh$250
October6.84 m/s2,201 kWh$284
November6.89 m/s2,157 kWh$279
December6.74 m/s2,135 kWh$276

What a taller tower would buy

Measured at 10 m the wind in Nance County averages 5.15 m/s; at 50 m it is 7.32 m/s. That gives a shear exponent of 0.218, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,664 to 29,299 kWh a year, 49% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.99 m/s19,664 kWh39 years
30 m6.55 m/s23,765 kWh33 years
40 m6.97 m/s26,846 kWh29 years
50 m7.32 m/s29,299 kWh26 years

Counties around Nance County

1 of the 6 closest counties is windier at turbine height; the windiest, Greeley County, averages 6.57 m/s.

Sun versus wind in Nance County

Nance County gets 4.3 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,256 kWh a year; one kW of the turbine above makes 2,378. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.