TurbinePayback

Wind Turbine Payback in Jefferson County, AL

Wind turbine payback in Jefferson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Jefferson County, AL averages 3.14 m/s (7 mph). A 10 kW turbine there would make about 3,034 kWh a year, worth $501 at AL's 16.51¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Jefferson County

A home turbine is not worth buying for savings in Jefferson County unless your spot is far windier than the county average, 7.5 m/s at the hub against 3.14 m/s here. Per kW, solar panels would make about 1,308 kWh a year here against the turbine's 303, so get a solar quote first.

What would have to change

Against the rest of AL

Jefferson County is the 2,952nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AL is Mobile County at 4.72 m/s, payback 57 years.

Month by month in Jefferson County

March is the strongest month here, at 3.65 m/s and about 420 kWh. July is the weakest, 2.36 m/s and 92 kWh, so the best month makes 4.6 times the worst. November to March brings in 56% of the year's output in Jefferson County.

MonthWind at 30 mOutputWorth
January3.50 m/s368 kWh$61
February3.62 m/s369 kWh$61
March3.65 m/s420 kWh$69
April3.62 m/s396 kWh$65
May3.04 m/s232 kWh$38
June2.61 m/s130 kWh$21
July2.36 m/s92 kWh$15
August2.44 m/s105 kWh$17
September2.88 m/s187 kWh$31
October3.19 m/s272 kWh$45
November3.39 m/s321 kWh$53
December3.41 m/s337 kWh$56

What a taller tower would buy

Measured at 10 m the wind in Jefferson County averages 1.89 m/s; at 50 m it is 3.97 m/s. That gives a shear exponent of 0.461, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,570 to 6,428 kWh a year, 309% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.6 m/s1,570 kWhover 100 years
30 m3.14 m/s3,025 kWhover 100 years
40 m3.58 m/s4,661 kWhover 100 years
50 m3.97 m/s6,428 kWh94 years

Counties around Jefferson County

4 of the 6 closest counties are windier at turbine height; the windiest, Blount County, averages 3.23 m/s.

Sun versus wind in Jefferson County

Jefferson County gets 4.48 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,308 kWh a year; one kW of the turbine above makes 303. Kilowatt for kilowatt, panels make 4.3 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.