TurbinePayback

Wind Turbine Payback in St. Clair County, AL

Wind turbine payback in St. Clair County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in St. Clair County, AL averages 3.21 m/s (7.2 mph). A 10 kW turbine there would make about 3,265 kWh a year, worth $539 at AL's 16.51¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in St. Clair County

A home turbine is not worth buying for savings in St. Clair County unless your spot is far windier than the county average, 7.5 m/s at the hub against 3.21 m/s here. Per kW, solar panels would make about 1,308 kWh a year here against the turbine's 327, so get a solar quote first.

What would have to change

Against the rest of AL

St. Clair County is the 2,874th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AL is Mobile County at 4.72 m/s, payback 57 years.

Month by month in St. Clair County

March is the strongest month here, at 3.73 m/s and about 449 kWh. July is the weakest, 2.41 m/s and 100 kWh, so the best month makes 4.5 times the worst. November to March brings in 57% of the year's output in St. Clair County.

MonthWind at 30 mOutputWorth
January3.62 m/s408 kWh$67
February3.70 m/s395 kWh$65
March3.73 m/s449 kWh$74
April3.68 m/s418 kWh$69
May3.11 m/s249 kWh$41
June2.64 m/s137 kWh$23
July2.41 m/s100 kWh$17
August2.48 m/s111 kWh$18
September2.93 m/s198 kWh$33
October3.26 m/s291 kWh$48
November3.49 m/s352 kWh$58
December3.51 m/s369 kWh$61

What a taller tower would buy

Measured at 10 m the wind in St. Clair County averages 1.97 m/s; at 50 m it is 4.03 m/s. That gives a shear exponent of 0.445, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,751 to 6,729 kWh a year, 284% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.68 m/s1,751 kWhover 100 years
30 m3.21 m/s3,267 kWhover 100 years
40 m3.65 m/s4,944 kWhover 100 years
50 m4.03 m/s6,729 kWh90 years

Counties around St. Clair County

3 of the 6 closest counties are windier at turbine height; the windiest, Etowah County, averages 3.3 m/s.

Sun versus wind in St. Clair County

St. Clair County gets 4.48 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,308 kWh a year; one kW of the turbine above makes 327. Kilowatt for kilowatt, panels make 4.0 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.