TurbinePayback

Wind Turbine Payback in Kiowa County, KS

Wind turbine payback in Kiowa County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Kiowa County, KS averages 6.6 m/s (14.8 mph). A 10 kW turbine there would make about 24,142 kWh a year, worth $3,684 at KS's 15.26¢/kWh. Against an installed cost of about $100,000, that is a payback of 27 years, and the turbine is built to last about 20.

What to do in Kiowa County

A home turbine is not worth buying for savings in Kiowa County unless your spot is far windier than the county average, 7.8 m/s at the hub against 6.6 m/s here. Per kW, solar panels would make about 1,416 kWh a year here against the turbine's 2,414, so get a solar quote first.

What would have to change

Against the rest of KS

Kiowa County is the 114th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in KS is Edwards County at 6.68 m/s, payback 27 years.

Month by month in Kiowa County

April is the strongest month here, at 7.48 m/s and about 2,498 kWh. August is the weakest, 5.81 m/s and 1,552 kWh, so the best month makes 1.6 times the worst. November to March brings in 42% of the year's output in Kiowa County.

MonthWind at 30 mOutputWorth
January6.36 m/s1,901 kWh$290
February6.50 m/s1,798 kWh$274
March7.00 m/s2,300 kWh$351
April7.48 m/s2,498 kWh$381
May6.75 m/s2,141 kWh$327
June6.78 m/s2,093 kWh$319
July5.94 m/s1,636 kWh$250
August5.81 m/s1,552 kWh$237
September6.61 m/s1,991 kWh$304
October6.76 m/s2,152 kWh$328
November6.75 m/s2,072 kWh$316
December6.46 m/s1,962 kWh$299

What a taller tower would buy

Measured at 10 m the wind in Kiowa County averages 5.2 m/s; at 50 m it is 7.38 m/s. That gives a shear exponent of 0.218, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,028 to 29,714 kWh a year, 48% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.04 m/s20,028 kWh33 years
30 m6.6 m/s24,159 kWh27 years
40 m7.03 m/s27,254 kWh24 years
50 m7.38 m/s29,714 kWh22 years

Counties around Kiowa County

1 of the 6 closest counties is windier at turbine height; the windiest, Edwards County, averages 6.68 m/s.

Sun versus wind in Kiowa County

Kiowa County gets 4.85 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,416 kWh a year; one kW of the turbine above makes 2,414. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.