TurbinePayback

Wind Turbine Payback in Latah County, ID

Wind turbine payback in Latah County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Latah County, ID averages 3.61 m/s (8.1 mph). A 10 kW turbine there would make about 4,778 kWh a year, worth $622 at ID's 13.02¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Latah County

A home turbine is not worth buying for savings in Latah County unless your spot is far windier than the county average, 8.7 m/s at the hub against 3.61 m/s here. Per kW, solar panels would make about 1,168 kWh a year here against the turbine's 478, so get a solar quote first.

What would have to change

Against the rest of ID

Latah County is the 2,382nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ID is Owyhee County at 5.38 m/s, payback 51 years.

Month by month in Latah County

March is the strongest month here, at 3.98 m/s and about 550 kWh. July is the weakest, 3.21 m/s and 276 kWh, so the best month makes 2.0 times the worst. November to March brings in 52% of the year's output in Latah County.

MonthWind at 30 mOutputWorth
January3.96 m/s543 kWh$71
February3.77 m/s421 kWh$55
March3.98 m/s550 kWh$72
April3.74 m/s438 kWh$57
May3.33 m/s313 kWh$41
June3.33 m/s303 kWh$39
July3.21 m/s276 kWh$36
August3.25 m/s288 kWh$37
September3.38 m/s318 kWh$41
October3.63 m/s413 kWh$54
November3.89 m/s495 kWh$64
December3.83 m/s489 kWh$64

What a taller tower would buy

Measured at 10 m the wind in Latah County averages 2.42 m/s; at 50 m it is 4.34 m/s. That gives a shear exponent of 0.363, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,944 to 8,403 kWh a year, 185% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.11 m/s2,944 kWhover 100 years
30 m3.61 m/s4,759 kWhover 100 years
40 m4 m/s6,589 kWhover 100 years
50 m4.34 m/s8,403 kWh91 years

Counties around Latah County

4 of the 6 closest counties are windier at turbine height; the windiest, Garfield County, averages 4.91 m/s.

Sun versus wind in Latah County

Latah County gets 4 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,168 kWh a year; one kW of the turbine above makes 478. Kilowatt for kilowatt, panels make 2.4 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.