TurbinePayback

Wind Turbine Payback in Nez Perce County, ID

Wind turbine payback in Nez Perce County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Nez Perce County, ID averages 3.94 m/s (8.8 mph). A 10 kW turbine there would make about 6,280 kWh a year, worth $818 at ID's 13.02¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Nez Perce County

A home turbine is not worth buying for savings in Nez Perce County unless your spot is far windier than the county average, 8.7 m/s at the hub against 3.94 m/s here. Per kW, solar panels would make about 1,168 kWh a year here against the turbine's 628, so get a solar quote first.

What would have to change

Against the rest of ID

Nez Perce County is the 2,096th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ID is Owyhee County at 5.38 m/s, payback 51 years.

Month by month in Nez Perce County

January is the strongest month here, at 4.38 m/s and about 736 kWh. August is the weakest, 3.38 m/s and 327 kWh, so the best month makes 2.3 times the worst. November to March brings in 53% of the year's output in Nez Perce County.

MonthWind at 30 mOutputWorth
January4.38 m/s736 kWh$96
February4.26 m/s611 kWh$80
March4.36 m/s723 kWh$94
April4.17 m/s615 kWh$80
May3.67 m/s429 kWh$56
June3.70 m/s425 kWh$55
July3.40 m/s336 kWh$44
August3.38 m/s327 kWh$43
September3.46 m/s344 kWh$45
October3.88 m/s511 kWh$67
November4.30 m/s671 kWh$87
December4.27 m/s681 kWh$89

What a taller tower would buy

Measured at 10 m the wind in Nez Perce County averages 2.97 m/s; at 50 m it is 4.49 m/s. That gives a shear exponent of 0.257, typical of ordinary open country. Going from 20 m to 50 m takes output from 4,521 to 9,279 kWh a year, 105% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.55 m/s4,521 kWhover 100 years
30 m3.94 m/s6,268 kWhover 100 years
40 m4.24 m/s7,841 kWh98 years
50 m4.49 m/s9,279 kWh83 years

Counties around Nez Perce County

3 of the 6 closest counties are windier at turbine height; the windiest, Columbia County, averages 5.18 m/s.

Sun versus wind in Nez Perce County

Nez Perce County gets 4 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,168 kWh a year; one kW of the turbine above makes 628. Kilowatt for kilowatt, panels make 1.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.