TurbinePayback

Wind Turbine Payback in Latimer County, OK

Wind turbine payback in Latimer County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Latimer County, OK averages 4 m/s (8.9 mph). A 10 kW turbine there would make about 6,577 kWh a year, worth $908 at OK's 13.81¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Latimer County

A home turbine is not worth buying for savings in Latimer County unless your spot is far windier than the county average, 8.4 m/s at the hub against 4 m/s here. Per kW, solar panels would make about 1,314 kWh a year here against the turbine's 658, so get a solar quote first.

What would have to change

Against the rest of OK

Latimer County is the 2,058th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in OK is Cimarron County at 6.82 m/s, payback 28 years.

Month by month in Latimer County

April is the strongest month here, at 4.73 m/s and about 883 kWh. August is the weakest, 3.18 m/s and 269 kWh, so the best month makes 3.3 times the worst. November to March brings in 51% of the year's output in Latimer County.

MonthWind at 30 mOutputWorth
January4.26 m/s676 kWh$93
February4.37 m/s658 kWh$91
March4.62 m/s855 kWh$118
April4.73 m/s883 kWh$122
May4.14 m/s619 kWh$85
June3.66 m/s411 kWh$57
July3.18 m/s269 kWh$37
August3.18 m/s269 kWh$37
September3.45 m/s339 kWh$47
October3.98 m/s550 kWh$76
November4.29 m/s670 kWh$93
December4.15 m/s623 kWh$86

What a taller tower would buy

Measured at 10 m the wind in Latimer County averages 2.68 m/s; at 50 m it is 4.81 m/s. That gives a shear exponent of 0.363, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 4,129 to 11,276 kWh a year, 173% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.45 m/s4,129 kWhover 100 years
30 m4 m/s6,557 kWhover 100 years
40 m4.44 m/s8,957 kWh81 years
50 m4.81 m/s11,276 kWh64 years

Counties around Latimer County

4 of the 6 closest counties are windier at turbine height; the windiest, McIntosh County, averages 5.63 m/s.

Sun versus wind in Latimer County

Latimer County gets 4.5 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,314 kWh a year; one kW of the turbine above makes 658. Kilowatt for kilowatt, panels make 2.0 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.