Wind Turbine Payback in Lincoln County, WY

Wind turbine payback in Lincoln County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Lincoln County, WY averages 4.83 m/s (10.8 mph). A 10 kW turbine there would make about 11,407 kWh a year, worth $1,598 at WY's 14.01¢/kWh. Against an installed cost of about $100,000, that is a payback of 63 years, and the turbine is built to last about 20.

What to do in Lincoln County

A home turbine is not worth buying for savings in Lincoln County unless your spot is far windier than the county average, 8.3 m/s at the hub against 4.83 m/s here. Per kW, solar panels would make about 1,361 kWh a year here against the turbine's 1,141, so get a solar quote first.

What would have to change

Against the rest of WY

Lincoln County is the 1,542nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WY is Albany County at 7.32 m/s, payback 24 years.

Month by month in Lincoln County

January is the strongest month here, at 5.32 m/s and about 1,252 kWh. July is the weakest, 3.98 m/s and 549 kWh, so the best month makes 2.3 times the worst. November to March brings in 50% of the year's output in Lincoln County.

MonthWind at 30 mOutputWorth
January5.32 m/s1,252 kWh$175
February5.32 m/s1,131 kWh$158
March5.31 m/s1,247 kWh$175
April5.25 m/s1,172 kWh$164
May4.63 m/s861 kWh$121
June4.66 m/s847 kWh$119
July3.98 m/s549 kWh$77
August4.06 m/s582 kWh$82
September4.47 m/s755 kWh$106
October4.87 m/s994 kWh$139
November5.01 m/s1,033 kWh$145
December5.14 m/s1,144 kWh$160

What a taller tower would buy

Measured at 10 m the wind in Lincoln County averages 3.6 m/s; at 50 m it is 5.54 m/s. That gives a shear exponent of 0.268, typical of ordinary open country. Going from 20 m to 50 m takes output from 8,367 to 16,326 kWh a year, 95% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.33 m/s8,367 kWh85 years
30 m4.83 m/s11,414 kWh63 years
40 m5.22 m/s14,035 kWh51 years
50 m5.54 m/s16,326 kWh44 years

Counties around Lincoln County

None of the 6 closest counties is windier than Lincoln County.

Sun versus wind in Lincoln County

Lincoln County gets 4.66 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,361 kWh a year; one kW of the turbine above makes 1,141. Kilowatt for kilowatt, panels make 1.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.