Wind turbine payback in Madison County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Madison County, ID averages 4.39 m/s (9.8 mph). A 10 kW turbine there would make about 8,690 kWh a year, worth $1,131 at ID's 13.02¢/kWh. Against an installed cost of about $100,000, that is a payback of 88 years, and the turbine is built to last about 20.

What to do in Madison County

A home turbine is not worth buying for savings in Madison County unless your spot is far windier than the county average, 8.7 m/s at the hub against 4.39 m/s here. Per kW, solar panels would make about 1,288 kWh a year here against the turbine's 869, so get a solar quote first.

What would have to change

Against the rest of ID

Madison County is the 1,825th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ID is Owyhee County at 5.38 m/s, payback 51 years.

Month by month in Madison County

March is the strongest month here, at 4.89 m/s and about 1,005 kWh. January is the weakest, 3.95 m/s and 538 kWh, so the best month makes 1.9 times the worst. November to March brings in 40% of the year's output in Madison County.

MonthWind at 30 mOutputWorth
January3.95 m/s538 kWh$70
February4.43 m/s683 kWh$89
March4.89 m/s1,005 kWh$131
April4.85 m/s949 kWh$124
May4.47 m/s779 kWh$101
June4.60 m/s819 kWh$107
July4.26 m/s675 kWh$88
August4.17 m/s634 kWh$83
September4.23 m/s641 kWh$83
October4.37 m/s730 kWh$95
November4.26 m/s653 kWh$85
December4.21 m/s651 kWh$85

What a taller tower would buy

Measured at 10 m the wind in Madison County averages 3.35 m/s; at 50 m it is 4.98 m/s. That gives a shear exponent of 0.246, typical of ordinary open country. Going from 20 m to 50 m takes output from 6,452 to 12,400 kWh a year, 92% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.97 m/s6,452 kWhover 100 years
30 m4.39 m/s8,701 kWh88 years
40 m4.71 m/s10,660 kWh72 years
50 m4.98 m/s12,400 kWh62 years

Counties around Madison County

2 of the 6 closest counties are windier at turbine height; the windiest, Bonneville County, averages 5.09 m/s.

Sun versus wind in Madison County

Madison County gets 4.41 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,288 kWh a year; one kW of the turbine above makes 869. Kilowatt for kilowatt, panels make 1.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.