TurbinePayback

Wind Turbine Payback in Clark County, ID

Wind turbine payback in Clark County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Clark County, ID averages 3.94 m/s (8.8 mph). A 10 kW turbine there would make about 6,280 kWh a year, worth $818 at ID's 13.02¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Clark County

A home turbine is not worth buying for savings in Clark County unless your spot is far windier than the county average, 8.7 m/s at the hub against 3.94 m/s here. Per kW, solar panels would make about 1,270 kWh a year here against the turbine's 628, so get a solar quote first.

What would have to change

Against the rest of ID

Clark County is the 2,096th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ID is Owyhee County at 5.38 m/s, payback 51 years.

Month by month in Clark County

April is the strongest month here, at 4.40 m/s and about 718 kWh. August is the weakest, 3.59 m/s and 398 kWh, so the best month makes 1.8 times the worst. November to March brings in 44% of the year's output in Clark County.

MonthWind at 30 mOutputWorth
January3.83 m/s487 kWh$63
February4.11 m/s547 kWh$71
March4.34 m/s712 kWh$93
April4.40 m/s718 kWh$93
May3.95 m/s537 kWh$70
June3.87 m/s489 kWh$64
July3.62 m/s411 kWh$54
August3.59 m/s398 kWh$52
September3.69 m/s423 kWh$55
October3.96 m/s541 kWh$70
November3.95 m/s520 kWh$68
December3.97 m/s545 kWh$71

What a taller tower would buy

Measured at 10 m the wind in Clark County averages 2.99 m/s; at 50 m it is 4.48 m/s. That gives a shear exponent of 0.251, typical of ordinary open country. Going from 20 m to 50 m takes output from 4,569 to 9,219 kWh a year, 102% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.56 m/s4,569 kWhover 100 years
30 m3.94 m/s6,284 kWhover 100 years
40 m4.24 m/s7,820 kWh98 years
50 m4.48 m/s9,219 kWh83 years

Counties around Clark County

5 of the 6 closest counties are windier at turbine height; the windiest, Madison County, averages 4.39 m/s.

Sun versus wind in Clark County

Clark County gets 4.35 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,270 kWh a year; one kW of the turbine above makes 628. Kilowatt for kilowatt, panels make 2.0 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.