Wind turbine payback in Merced County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Merced County, CA averages 4.5 m/s (10.1 mph). A 10 kW turbine there would make about 9,339 kWh a year, worth $3,043 at CA's 32.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 33 years, and the turbine is built to last about 20.

What to do in Merced County

A home turbine is not worth buying for savings in Merced County unless your spot is far windier than the county average, 5.4 m/s at the hub against 4.5 m/s here. Per kW, solar panels would make about 1,562 kWh a year here against the turbine's 934, so get a solar quote first.

What would have to change

Against the rest of CA

Merced County is the 1,743rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CA is San Francisco County at 6.53 m/s, payback 13 years.

Month by month in Merced County

June is the strongest month here, at 5.54 m/s and about 1,340 kWh. January is the weakest, 3.53 m/s and 378 kWh, so the best month makes 3.5 times the worst. November to March brings in 26% of the year's output in Merced County.

MonthWind at 30 mOutputWorth
January3.53 m/s378 kWh$123
February4.09 m/s542 kWh$177
March4.35 m/s716 kWh$233
April4.98 m/s1,020 kWh$332
May5.26 m/s1,216 kWh$396
June5.54 m/s1,340 kWh$437
July5.15 m/s1,153 kWh$376
August4.87 m/s988 kWh$322
September4.53 m/s784 kWh$255
October4.13 m/s616 kWh$201
November3.69 m/s421 kWh$137
December3.81 m/s480 kWh$156

What a taller tower would buy

Measured at 10 m the wind in Merced County averages 3.55 m/s; at 50 m it is 5.02 m/s. That gives a shear exponent of 0.215, typical of ordinary open country. Going from 20 m to 50 m takes output from 7,208 to 12,670 kWh a year, 76% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.12 m/s7,208 kWh43 years
30 m4.5 m/s9,326 kWh33 years
40 m4.78 m/s11,114 kWh28 years
50 m5.02 m/s12,670 kWh24 years

Counties around Merced County

None of the 6 closest counties is windier than Merced County.

Sun versus wind in Merced County

Merced County gets 5.35 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,562 kWh a year; one kW of the turbine above makes 934. Kilowatt for kilowatt, panels make 1.7 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.