TurbinePayback

Wind Turbine Payback in Madera County, CA

Wind turbine payback in Madera County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Madera County, CA averages 3.56 m/s (8 mph). A 10 kW turbine there would make about 4,570 kWh a year, worth $1,489 at CA's 32.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 67 years, and the turbine is built to last about 20.

What to do in Madera County

A home turbine is not worth buying for savings in Madera County unless your spot is far windier than the county average, 5.4 m/s at the hub against 3.56 m/s here. Per kW, solar panels would make about 1,556 kWh a year here against the turbine's 457, so get a solar quote first.

What would have to change

Against the rest of CA

Madera County is the 2,451st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CA is San Francisco County at 6.53 m/s, payback 13 years.

Month by month in Madera County

June is the strongest month here, at 4.36 m/s and about 700 kWh. November is the weakest, 2.96 m/s and 204 kWh, so the best month makes 3.4 times the worst. November to March brings in 30% of the year's output in Madera County.

MonthWind at 30 mOutputWorth
January3.12 m/s253 kWh$82
February3.44 m/s315 kWh$103
March3.52 m/s376 kWh$123
April3.99 m/s537 kWh$175
May4.19 m/s642 kWh$209
June4.36 m/s700 kWh$228
July4.00 m/s559 kWh$182
August3.55 m/s385 kWh$125
September3.26 m/s281 kWh$92
October3.12 m/s253 kWh$82
November2.96 m/s204 kWh$66
December3.27 m/s296 kWh$96

What a taller tower would buy

Measured at 10 m the wind in Madera County averages 2.82 m/s; at 50 m it is 3.97 m/s. That gives a shear exponent of 0.213, typical of ordinary open country. Going from 20 m to 50 m takes output from 3,457 to 6,428 kWh a year, 86% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.27 m/s3,457 kWh89 years
30 m3.56 m/s4,573 kWh67 years
40 m3.79 m/s5,549 kWh55 years
50 m3.97 m/s6,428 kWh48 years

Counties around Madera County

3 of the 6 closest counties are windier at turbine height; the windiest, Merced County, averages 4.5 m/s.

Sun versus wind in Madera County

Madera County gets 5.33 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,556 kWh a year; one kW of the turbine above makes 457. Kilowatt for kilowatt, panels make 3.4 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.