Wind Turbine Payback in Millard County, UT

Wind turbine payback in Millard County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Millard County, UT averages 4.53 m/s (10.1 mph). A 10 kW turbine there would make about 9,519 kWh a year, worth $1,256 at UT's 13.19¢/kWh. Against an installed cost of about $100,000, that is a payback of 80 years, and the turbine is built to last about 20.

What to do in Millard County

A home turbine is not worth buying for savings in Millard County unless your spot is far windier than the county average, 8.7 m/s at the hub against 4.53 m/s here. Per kW, solar panels would make about 1,504 kWh a year here against the turbine's 952, so get a solar quote first.

What would have to change

Against the rest of UT

Millard County is the 1,731st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in UT is Daggett County at 5.32 m/s, payback 51 years.

Month by month in Millard County

April is the strongest month here, at 5.28 m/s and about 1,190 kWh. January is the weakest, 3.95 m/s and 538 kWh, so the best month makes 2.2 times the worst. November to March brings in 38% of the year's output in Millard County.

MonthWind at 30 mOutputWorth
January3.95 m/s538 kWh$71
February4.53 m/s731 kWh$96
March4.99 m/s1,057 kWh$139
April5.28 m/s1,190 kWh$157
May4.66 m/s874 kWh$115
June5.00 m/s1,028 kWh$136
July4.31 m/s698 kWh$92
August4.49 m/s786 kWh$104
September4.36 m/s701 kWh$92
October4.24 m/s664 kWh$88
November4.28 m/s663 kWh$87
December4.31 m/s698 kWh$92

What a taller tower would buy

Measured at 10 m the wind in Millard County averages 3.56 m/s; at 50 m it is 5.07 m/s. That gives a shear exponent of 0.220, typical of ordinary open country. Going from 20 m to 50 m takes output from 7,324 to 13,010 kWh a year, 78% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.14 m/s7,324 kWhover 100 years
30 m4.53 m/s9,526 kWh80 years
40 m4.83 m/s11,388 kWh67 years
50 m5.07 m/s13,010 kWh58 years

Counties around Millard County

2 of the 6 closest counties are windier at turbine height; the windiest, Iron County, averages 5.21 m/s.

Sun versus wind in Millard County

Millard County gets 5.15 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,504 kWh a year; one kW of the turbine above makes 952. Kilowatt for kilowatt, panels make 1.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.