TurbinePayback

Wind Turbine Payback in Monterey County, CA

Wind turbine payback in Monterey County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Monterey County, CA averages 4.07 m/s (9.1 mph). A 10 kW turbine there would make about 6,934 kWh a year, worth $2,259 at CA's 32.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 44 years, and the turbine is built to last about 20.

What to do in Monterey County

A home turbine is not worth buying for savings in Monterey County unless your spot is far windier than the county average, 5.4 m/s at the hub against 4.07 m/s here. Per kW, solar panels would make about 1,539 kWh a year here against the turbine's 693, so get a solar quote first.

What would have to change

Against the rest of CA

Monterey County is the 2,014th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CA is San Francisco County at 6.53 m/s, payback 13 years.

Month by month in Monterey County

May is the strongest month here, at 4.62 m/s and about 855 kWh. September is the weakest, 3.73 m/s and 435 kWh, so the best month makes 2.0 times the worst. November to March brings in 39% of the year's output in Monterey County.

MonthWind at 30 mOutputWorth
January3.90 m/s517 kWh$168
February4.17 m/s574 kWh$187
March4.19 m/s644 kWh$210
April4.56 m/s795 kWh$259
May4.62 m/s855 kWh$279
June4.56 m/s800 kWh$261
July3.85 m/s495 kWh$161
August3.75 m/s456 kWh$149
September3.73 m/s435 kWh$142
October3.77 m/s467 kWh$152
November3.80 m/s462 kWh$151
December4.02 m/s567 kWh$185

What a taller tower would buy

Measured at 10 m the wind in Monterey County averages 3.32 m/s; at 50 m it is 4.48 m/s. That gives a shear exponent of 0.186, typical of ordinary open country. Going from 20 m to 50 m takes output from 5,513 to 9,219 kWh a year, 67% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.78 m/s5,513 kWh56 years
30 m4.07 m/s6,955 kWh44 years
40 m4.3 m/s8,164 kWh38 years
50 m4.48 m/s9,219 kWh33 years

Counties around Monterey County

2 of the 6 closest counties are windier at turbine height; the windiest, Merced County, averages 4.5 m/s.

Sun versus wind in Monterey County

Monterey County gets 5.27 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,539 kWh a year; one kW of the turbine above makes 693. Kilowatt for kilowatt, panels make 2.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.